Finding · records checked to 15 November 2026
Disclosed IT load in the UK data centre pipeline
14 of 65 pipeline facility records (proposed, planning submitted, approved or under construction) publish a defined IT load figure, totalling 4,543 MW. The other 51 publish no defined IT load, so this is the disclosed total for these records, not an estimate for the whole UK pipeline.
Coverage: the 65 records were last checked between 1 October 2026 and 15 November 2026.
Method
Only figures defined as IT load are added. Grid connection capacity, stated electrical demand, whole-campus build-out and megawatt figures with no published definition are excluded, as are AI Growth Zone area records. Each campus is counted once, using its largest single figure. This is the same rule as the tracker totals; see the research methodology.
Supporting profiles
- Devon Data Campus (Xlinks), near Great Torrington · Proposed · 1,500 MW
- Elsham Tech Park, former RAF Elsham Wolds · Approved · 1,000 MW
- Cambois data centre campus · Under construction · 720 MW
- SDC M40 Campus, Wapseys Wood landfill, Gerrards Cross · Proposed · 300 MW
- Ebbsfleet AI Data Centre Campus, New Barn Road, Dartford (Clearstone) · Proposed · 240 MW
- Microsoft Newport Imperial Park (CWL01), former Quinn Radiators site · Approved · 200 MW
- CloudHQ LHR Campus, Didcot · Approved · 101 MW
- Data centre campus, Hayes Bridge and Heathrow Interchange · Approved · 97 MW
- CyrusOne LON6, Iver Heath · Approved · 90 MW
- Bidder Street data centre, Canning Town · Approved · 80 MW
- Manor Farm and land north of Wraysbury Reservoir · Approved · 72 MW
- Thames Valley Park Data Centre, Earley · Planning submitted · 72 MW
- Kao Data Kenwood Point, Stockport · Approved · 40 MW
- Data centre campus, Tudor Works, Hayes · Under construction · 31 MW
Devon Data Campus (Xlinks), near Great Torrington
Torridge District Council defended its May 2025 letter supporting the AI Growth Zone expression of interest, which came to light through campaigners' FOI requests; it says the letter did not back the specific data centre or site.
SourceEast Havering Data Centre Campus, North Ockendon
Residents protested against the campus in North Ockendon.
SourceDataVita DV4, Chapelhall
DataVita told the Guardian its Chapelhall data centres will be "fully grid served", with renewables bought through a power purchase agreement, replacing the earlier pledge of more than 1GW of private-wire renewables.
SourceDataVita DV3, Chapelhall
DataVita told the Guardian its Chapelhall data centres will be "fully grid served", with renewables bought through a power purchase agreement, replacing the earlier pledge of more than 1GW of private-wire renewables.
SourceLanarkshire AI Growth Zone
DataVita told the Guardian its Chapelhall data centres will be "fully grid served", with renewables bought through a power purchase agreement, replacing the earlier pledge of more than 1GW of private-wire renewables.
SourceHilfield Park data centre campus (former Mercure Hotel, Tylers Way), Hertsmere (Ark Data Centres)
Hertsmere planning committee deferred its decision to seek more evidence on water supply from Affinity Water, further Section 106 talks and more on height and design.
SourceAiOnX Cambridge Innovation Campus, Elean Business Park, Sutton
East Cambridgeshire district councillor raises concerns over SWI Group's plans to scale the Elean Business Park campus up to a reported 330MW.
SourceDurham Technology Park (Tract), Murton / South Hetton
Tract announces its first UK project, a campus of up to 500MW near Murton, County Durham, with a planning application planned for December 2026.
SourceEra4 AI data centre, Erin Landfill, Chesterfield
Fireworks AI contracts 5MW of Nvidia Blackwell Ultra capacity at Era4's Chesterfield data centre.
SourceTelehouse Inventory Estate data centre, East India Dock
KDDI and Telehouse confirm the purchase of the Inventory Estate for more than £220m, with 65MVA of power reported secured.
SourceSembcorp Wilton International Data Centre (phase 1), former Invista site, Wilton
Planning permission granted under delegated powers.
SourceHilfield Park data centre campus (former Mercure Hotel, Tylers Way), Hertsmere (Ark Data Centres)
Officers recommend approval; planning committee to decide on 5 Nov 2026 (1,184 objections).
SourceTeesworks data centre campus (former Redcar Sinter Plant), Redcar
National Grid agrees to buy 73.3 acres at Dorman Point for a ~1.44 GW 400 kV substation to serve the data centre
SourceCambois data centre campus
Quod, for Renaissance Land and QTS, applied for non-material amendments to the approved plans in the phase 1 reserved matters permission.
SourceCardiff East Park and Ride data centre campus (Curtis Hall), Llanrumney
Temporary gas energy centre (up to about 49.9MW, 2028 to 2033) reported while the 150MW grid connection is awaited.
SourceNscale Loughton sovereign AI data centre
Microsoft ends its agreement to anchor the Loughton site after grid power slipped into the 2030s. Nscale says it is still committed and is looking at alternative power sources.
SourceLongmarsh Green Energy data centre campus, Tilney St Lawrence and Fincham, West Norfolk
EPL Norfolk Limited unveils Longmarsh Green Energy (data centre and solar farm) and opens public consultation running to 26 Nov 2026.
SourceEra4 AI data centre, Shelford Landfill, Broad Oak, Sturry, Canterbury
Canterbury City Council planning committee approves the scheme (4 for, 1 against, 3 abstentions); decision notice not yet seen.
SourceBryn Coch Business Park data centre (former Ferodo factory), Griffith's Crossing, Caernarfon
Rally held against the scheme; a petition opposing it had passed 22,000 signatures.
SourceArk Spring Park campus extension (Westwells Road), Neston, Corsham
Legal agreements linked to the planning permission reported as signed, allowing construction to begin.
SourceSpodegreen Data Centre, Little Bollington
Residents raise concerns over the scale of the scheme and its green belt location, DCD reports.
SourceCaineal AI data centre, A127 / Old Nevendon Road, Wickford
Surveyors reported on site; no construction start date announced.
SourceSkelton Grange, Leeds
Petition against the scheme reported at more than 44,000 signatures, after about 250 people joined a Millennium Square protest organised by No Leeds Data Centre. West Yorkshire Mayor Tracy Brabin backed the scheme on economic grounds; Green group leader Cllr Penny Stables warned it would mean burning more gas.
SourceSpodegreen Data Centre, Little Bollington
First public consultation drop-in held at High Legh Village Hall. Innova expects to apply to Cheshire East Council in late 2026 or early 2027.
SourceCX Technology Campus, Chapelcross
Application for planning permission in principle reported as submitted to Dumfries and Galloway Council (exact lodging date not confirmed).
SourceManor Farm West, west of Poyle Trading Estate (three data centres)
Plans for three data centres (199MW reported) submitted to Slough Borough Council, with a separate cable-route application to Laleham substation.
SourceAmazon Data Services, Ridgeway Distribution Centre, Iver
Buckinghamshire Council approves the scheme subject to conditions and a legal agreement.
SourceDevon Data Campus (Xlinks), near Great Torrington
Public consultation postponed amid growing local opposition; no application submitted yet.
SourceThames Valley Park Data Centre, Earley
Outline application for a 72MW data centre reported as submitted to Wokingham Borough Council in late September 2026 (exact lodging date not confirmed). A decision is expected by March 2027.
SourceNscale Loughton sovereign AI data centre
Guardian reports UK Power Networks cannot supply the requested 90MW until the early-to-mid 2030s; 2027 launch expected to slip.
SourceBryn Coch Business Park data centre (former Ferodo factory), Griffith's Crossing, Caernarfon
Environmental Statement notice published for C25/0740/20/EIA; representations invited until 17 Oct 2026.
SourceCardiff East Park and Ride data centre campus (Curtis Hall), Llanrumney
Welsh Government holding direction reported: Cardiff Council cannot grant 26/00109/HYB while ministers consider calling it in.
SourcePure DC LON01 B2, Brent Cross
Glencar began piling for the west shell of the 70MW LON01 B2 building.
SourceDataVita DV4, Chapelhall
DataVita submitted a planning permission in principle application for DV4 (£849.6m).
SourceSkelton Grange, Leeds
A 38 Degrees petition opposing the scheme passed 39,000 signatures; 993 formal objections reported.
SourceDataVita DV3, Chapelhall
DataVita announced a £300m debt facility covering the DV1 expansion and DV3 construction, including a National Wealth Fund guarantee.
SourceLanarkshire AI Growth Zone
£300m debt facility and Dell's Scottish base announced for the zone.
SourceDataVita DV1, Chapelhall
c.£300m debt facility secured to expand DV1 and build DV3, with £202m National Wealth Fund guarantee
Source1 Redheughs Avenue data centre, South Gyle
Scottish Ministers recalled the appeal; it is now being decided by Ministers rather than the reporter.
SourceSouth Wales AI Growth Zone
Vantage announced Nebius as the first commercial capacity commitment in the zone, at Newport.
SourceAmazon Data Services, Ridgeway Distribution Centre, Iver
Environment Agency advertises generator permit application EPR/TP3621MM/A001.
SourceImperial Park campus, Newport (Vantage, formerly Next Generation Data)
Vantage announces Nebius will deploy high-density AI capacity at the Newport campus, the first commitment in the South Wales AI Growth Zone.
Source1 Redheughs Avenue data centre, South Gyle
The appellant's agent confirmed that an EIA Report will be submitted. The DPEA lists the case as on hold.
SourceTelehouse West Two, London Docklands campus
Telehouse campus update (July 2026): piling and ground works complete ahead of schedule, ground-floor slab done, steelwork started.
Source1 Redheughs Avenue data centre, South Gyle
The DPEA issued an environmental impact assessment screening direction for the appeal.
SourceConesby Data Centre Campus, Normanby Road, near Scunthorpe (Rivington Energy)
Flixborough Parish Council minutes record the scheme as still at pre-application stage, with an EIA screening request pending.
SourceThames Valley Park Data Centre, Earley
Public consultation event held at Pearson Hall, Sonning.
SourceEbbsfleet AI Data Centre Campus, New Barn Road, Dartford (Clearstone)
Government issued a Section 35 direction: the campus will be decided as a nationally significant project through a Development Consent Order.
SourceMwyndy Cross data centre, land east of A4119, Pontyclun
Rhondda Cynon Taf council planning notice (dated 22 Jun 2026) advertises application 26/0404/FUL for a 21,490 sq m data centre by Talbot Green Developments Ltd.
SourceMwyndy Cross data centre, land east of A4119, Pontyclun
Rhondda Cynon Taf Council validates full application 26/0404/FUL for a 21,490 sq m data centre at Mwyndy Cross.
SourceData Centre Campus, Ampthill Road, Bedford
Section 35 direction granted: the scheme is to be treated as nationally significant infrastructure needing a Development Consent Order.
SourceManor Farm and land north of Wraysbury Reservoir
The Secretary of State allowed the appeal, subject to conditions (APP/J0350/W/25/3366043).
SourceSDC M40 Campus, Wapseys Wood landfill, Gerrards Cross
Planning Inspectorate issues scoping opinion for SDC M40 Campus (EN0110030); DCO application expected Jan 2027.
SourceArk Longcross Park data centre campus, Longcross Garden Village, Chertsey
Ark announces new building (LP02, 36 MW) and extensions at Longcross; £807m investment
SourcePure DC LON01 B2, Brent Cross
Pure DC appointed Glencar to deliver the final build phase of LON01 (B2), due for completion in Q2 2029.
SourceDeep Green Bradford, Listerhills Road
City of Bradford MDC granted permission subject to a Unilateral Undertaking (25/02212/MAF).
SourceCX Technology Campus, Chapelcross
Pre-application consultation began, with events at Creca Village Hall and Victoria Hall, Annan on 12 to 13 May and 16 to 17 June 2026.
SourceKao Data Park Royal (former Frogmore Industrial Estate)
Kao Data announced it had acquired the former Frogmore Industrial Estate site in Park Royal for a data centre.
SourceSembcorp Wilton International Data Centre (phase 1), former Invista site, Wilton
Digital Reef and Sembcorp submit a full planning application for phase 1 (R/2026/0337/FFM).
SourceConesby Data Centre Campus, Normanby Road, near Scunthorpe (Rivington Energy)
Rivington Energy opened a pre-application consultation on the campus and adjoining solar farm, running to 31 May 2026.
SourceSkelton Grange, Leeds
Leeds City Council Plans Panel resolved to grant permission for the Microsoft data centre, delegated to the Chief Planning Officer subject to a S106 agreement and conditions.
SourceNorth East England AI Growth Zone (Cobalt Park & Blyth)
OpenAI paused Stargate UK, citing energy costs and regulation.
SourceSembcorp Wilton International Data Centre (phase 1), former Invista site, Wilton
Redcar and Cleveland Council decides an EIA is not required for the data centre (screening R/2026/0183/SC).
Source1 Redheughs Avenue data centre, South Gyle
Shelborn Drummond lodged an appeal with the DPEA (PPA-230-2794).
SourceSDC M40 Campus, Wapseys Wood landfill, Gerrards Cross
Section 35 direction: the campus is to be treated as a nationally significant infrastructure project (DCO route).
SourceElsham Tech Park, former RAF Elsham Wolds
North Lincolnshire Council Planning Committee resolved to grant outline permission PA/2025/643 in line with the officer report (minded to approve subject to National Highways' holding objection being resolved and a s106 agreement).
SourceEast Havering Data Centre Campus, North Ockendon
Planning authority opened consultation on the draft LDO (6 March to 12 April 2026).
SourceEast Havering Data Centre Campus, North Ockendon
Havering Strategic Planning Committee approved the draft Local Development Order for consultation.
SourcePremier Park data centre, Park Royal
OPDC Planning Committee resolved on the application (25/0196/FUMOPDC).
SourceAda Docklands Data Campus, Royal Docks
Groundbreaking for Data Centre Buildings Two and Three and the multi-functional building; lead contractor McLaren has started piling.
SourcePinewood South data centre, land south of Pinewood Studios, Iver Heath
Buckinghamshire Council votes to approve the data centre campus plans, reported by DCD. Decision notice not yet seen.
SourceAmazon Web Services, Plot 3 Maylands Avenue
Trade press reports Amazon has lodged plans with Dacorum Borough Council for a tape storage data centre at Plot 3 Maylands Avenue.
SourceArk Spring Park campus extension (Westwells Road), Neston, Corsham
Wiltshire Council's Strategic Planning Committee approved the extension (PL/2024/05527), subject to conditions.
SourceCardiff East Park and Ride data centre campus (Curtis Hall), Llanrumney
Plans reported for a data centre campus on the Cardiff East Park and Ride site, Llanrumney.
Source1 Redheughs Avenue data centre, South Gyle
City of Edinburgh Council Development Management Sub-Committee refused the application, against officers' recommendation.
SourceLanarkshire AI Growth Zone
Lanarkshire named Scotland's AI Growth Zone, led by DataVita with CoreWeave.
SourceWest London Technology Park (Woodlands Park landfill site), Iver
High Court granted permission for judicial review; the government accepted the permission should be quashed for lack of an environmental impact assessment.
SourceCambois data centre campus
Reserved matters permission 25/02911/REM issued for phase 1 (data centres 1 and 2).
SourceHilfield Park data centre campus (former Mercure Hotel, Tylers Way), Hertsmere (Ark Data Centres)
Full application 25/1781/FUL registered by Hertsmere Borough Council (week of 15 to 28 Dec 2025).
SourcePinewood South data centre, land south of Pinewood Studios, Iver Heath
Buckinghamshire Council resolves to grant outline permission (up to 55,030 sqm data centre plus nature reserve), reported by Construction Briefing.
SourceGoogle data centre, North Weald Airfield
Epping Forest District Council Planning Committee A voted to approve outline application EPF/0849/25 with conditions (officer recommendation: subject to a s106 legal agreement).
SourceEquinix Wexham Road (former AkzoNobel site)
Slough Borough Council Planning Committee voted to delegate approval of Equinix's outline application (P/00072/152, up to 90,614 sqm GEA) to the Planning Manager, subject to a district heating contribution.
SourceSouth Wales AI Growth Zone
South Wales named an AI Growth Zone with Vantage Data Centers and Microsoft.
SourceNorth Wales AI Growth Zone
North Wales (Prosperity Parc and Trawsfynydd) named an AI Growth Zone.
SourceHilfield Park data centre campus (former Mercure Hotel, Tylers Way), Hertsmere (Ark Data Centres)
Ark Data Centres launches public consultation on a data centre campus on the former Mercure Hotel site.
SourceDC01UK, South Mimms
DC01UK announced the sale of the scheme.
SourceData centre campus, Hayes Bridge and Heathrow Interchange
London Borough of Hillingdon approved the hybrid application (Phase 1 full, Phases 2 to 4 outline).
SourceAmazon Data Services, Ridgeway Distribution Centre, Iver
Amazon Data Services UK files plans to replace 17 warehouse units with a data centre (ref T3PLZVESLZY00).
SourceTelehouse West Two, London Docklands campus
Telehouse announces West Two, a nine-storey 33MW, £275m data centre at its Docklands campus, due to complete in 2028.
SourceBryn Coch Business Park data centre (former Ferodo factory), Griffith's Crossing, Caernarfon
Outline application validated by Cyngor Gwynedd, as reported by the Daily Post.
SourceVantage Bridgend campus (former Ford engine plant)
Bridgend County Borough Council Development Control Committee approved the hybrid application (P/25/247/HYB).
SourceCaineal AI data centre, A127 / Old Nevendon Road, Wickford
Basildon Council's planning committee resolved to grant permission for the £1.3bn data centre.
SourceBryn Coch Business Park data centre (former Ferodo factory), Griffith's Crossing, Caernarfon
Planning notice published for an outline application by Gwelyfenai Limited for data centre development on the former Ferodo factory site.
SourceNorth East England AI Growth Zone (Cobalt Park & Blyth)
North East England (Cobalt Park and Blyth) named an AI Growth Zone alongside the UK-US Tech Prosperity Deal.
SourceProsperity Parc, Holyhead (Anglesey)
Isle of Anglesey County Council granted outline planning permission (OP/2025/2).
Source45 Maylands Avenue, Hemel Hempstead
Outline planning approval reported for a 5,000 sqm data centre at 45 Maylands Avenue.
SourceEquinix Slough campus (LD4 to LD7, LD14), Slough Trading Estate
Environment Agency grants variation EPR/LP3303PR/V004 to the Slough campus permit, adding the new LD14 building with 12 new standby generators.
SourceTeesworks data centre campus (former Redcar Sinter Plant), Redcar
Redcar and Cleveland Council grants reserved matters R/2025/0382/ESM for the data centre campus
SourceData centre, former White's Reclamation Site, Eccles
Salford City Council issued the decision notice: approved with conditions (PA/2024/1810).
SourceWest London Technology Park (Woodlands Park landfill site), Iver
Secretary of State allowed the appeal, treating the site as grey belt.
SourcePinewood South data centre, land south of Pinewood Studios, Iver Heath
Pinewood Group submits outline planning application to Buckinghamshire Council for a data centre on land south of Pinewood Studios.
SourceHaspielaw Farm, Hamilton
South Lanarkshire Council issued an EIA screening opinion: environmental impact assessment required (P/25/0490).
SourceDigital Realty Crawley
Environment Agency issued an environmental permit (EPR/EP3022ST/A001).
SourceLand off Bedmond Road data centre, Abbots Langley
Secretary of State allowed the recovered appeal and granted outline permission.
SourceCambois data centre campus
Northumberland County Council permitted the outline application (24/04112/OUTES).
SourceCobalt Data Centre Campus (Stellium)
North Tyneside Council permitted the application (24/01678/FULM).
SourceKao Data Harlow, Plot F (KLON-07 and KLON-08)
Harlow Council confirmed that KLON-07 and KLON-08 on Plot F comply with the London Road (North) Local Development Order (HW/LDOC/25/00111).
SourceRover Way energy park and data centre, Splott
Cardiff Council granted permission (24/00624/FUL).
SourceAda Docklands Data Campus, Royal Docks
Newham Council advertised reserved matters applications 25/00541/REM (Zone 2) and 25/00542/REM (Zone 3) for data centre buildings under hybrid permission 23/01697/OUT, Former Paint Factory and Central Thameside West, North Woolwich Road.
SourceYondr London campus (former Uxbridge Road gas works and AkzoNobel paint factory), Slough
Ground broken on Building 3 (40 MW)
SourceData centre, former White's Reclamation Site, Eccles
Salford City Council Planning Panel considered the application and resolved to approve; decision notice issued 23 July 2025.
SourceDC01UK, South Mimms
Hertsmere Borough Council planning committee granted outline permission.
SourceCulham AI Growth Zone
Culham named the UK's first AI Growth Zone in the AI Opportunities Action Plan.
SourceCourt Lane Industrial Estate data centre, Iver
Secretary of State allowed the recovered appeal and granted outline permission.
SourceBidder Street data centre, Canning Town
Newham's Strategic Development Committee unanimously approved the Bidder Street data centre.
SourceGreenScale Derry Campus (formerly Atlantic Hub), Foyle Port
Derry City and Strabane District Council granted reserved matters (LA11/2023/1729/RM) on 9 October 2024 to Atlantic Hub Property Limited.
SourceMicrosoft Newport Imperial Park (CWL01), former Quinn Radiators site
Reported: Microsoft to fund £104,000 of walking and cycling routes on Celtic Way under the planning agreement for the data centre.
SourceDC01UK, South Mimms
Outline application submitted to Hertsmere Borough Council.
SourceHumber Tech Park, land south of the A160, South Killingholme
North Lincolnshire Council planning committee approves outline application PA/2024/584
SourceYondr London campus (former Uxbridge Road gas works and AkzoNobel paint factory), Slough
Slough Borough Council grants permission for Building C (40 MW, four data halls)
SourceMicrosoft Newport Imperial Park (CWL01), former Quinn Radiators site
Newport City Council's planning committee unanimously approved application 24/0006: demolition of the remaining Quinn Radiators buildings and two data centre buildings with backup generators.
SourceWest London Technology Park (Woodlands Park landfill site), Iver
Buckinghamshire Council refused the second application (PL/24/0754/OA) for up to 72,000 sqm.
SourceVantage CWL2 campus, Bro Tathan, St Athan
Vale of Glamorgan planning committee resolved to approve the data centre (2023/00780/FUL), subject to a Section 106 agreement.
SourceGoogle Waltham Cross data centre
Environment Agency advertised bespoke permit application EPR/ZP3128SD/A001 by Global Infrastructure UK Limited (combustion plant over 50MWth) for the data centre at Maxwells Farm West, Cheshunt EN8 8XH.
SourceKao Data Kenwood Point, Stockport
Approved at Stockport Council's Heatons and Reddish Area Committee (DC/090411).
SourceLand off Bedmond Road data centre, Abbots Langley
Three Rivers District Council refused outline permission (23/1068/OUT).
SourceKao Data Harlow campus (KLON-01 to KLON-03), London Road, Harlow
KLON-02 (10 MW) completed, commissioned and operational
SourceWest London Technology Park (Woodlands Park landfill site), Iver
Secretary of State dismissed the appeal for the first, larger data centre scheme on green belt grounds.
SourceEquinix LD8, London Docklands
Environment Agency issued an environmental permit (EPR/DP3906BE/A001).
SourceCourt Lane Industrial Estate data centre, Iver
Buckinghamshire Council refused outline permission (PL/22/4145/OA).
SourceTelehouse Inventory Estate data centre, East India Dock
Planning inspector allows the appeal against Tower Hamlets' refusal, granting outline consent including a data centre at the Inventory Estate (decision dated 12 October 2023).
SourceMicrosoft Newport Imperial Park (CWL01), former Quinn Radiators site
Microsoft confirmed plans for a datacentre on the former Quinn Radiators site at Imperial Park and began pre-application consultation.
SourceTeledata Wythenshawe
Manchester City Council approved the 45,000 sq ft facility (137424/FO/2023, reported).
SourceGoogle Waltham Cross data centre
Broxbourne Planning and Regulatory Committee resolved to grant reserved matters 07/23/0361/RM for the data centre (Phase 3, Maxwells Farm West) under outline 07/18/1181/O, subject to drainage, noise and air quality matters and a unilateral obligation.
SourceData centre campus, Tudor Works, Hayes
Colt DCS announced groundbreaking on London 4 at Hayes.
SourceEast Havering Data Centre Campus, North Ockendon
Havering Cabinet agreed that officers and Digital Reef should keep developing the East Havering data centre proposals (then £5.3bn).
SourceData centre campus, Tudor Works, Hayes
London Borough of Hillingdon approved the application (38421/APP/2021/4045).
SourceKao Data Harlow campus (KLON-01 to KLON-03), London Road, Harlow
Construction of KLON-02 begins
SourceVIRTUS Stockley Park campus
Environment Agency permit granted for London 5 and London 6; refused in part for London 7 and London 8.
SourceNTT London 1 data centre, Yew Tree Avenue, Dagenham
London 1A (first building) opens: 12,800 sqm, 32 MW IT load
SourceEquinix Wexham Road (former AkzoNobel site)
Outline permission P/00072/096 granted for mixed-use redevelopment of the former AkzoNobel site (an earlier scheme, before Equinix bought the site).
SourceImperial Park campus, Newport (Vantage, formerly Next Generation Data)
Vantage Data Centers agreed to acquire the NGD campus in Newport.
SourceGlobal Switch London
Environment Agency issued an environmental permit (EPR/BP3530YR/A001).
SourceDigital Realty Woking data centre
Environment Agency publishes environmental permit EPR/TP3530DV issued to Digital Realty (UK) Limited for the GU21 3BA site.
SourceCarlton Park Data Centre 1 & 2, Narborough
Environment Agency publishes environmental permit EPR/QP3533ED/A001 issued to Santander UK plc for standby generation at LE19 0AL.
Source