This week

The latest published events in the tracker, newest first.

Finding · records checked to 15 November 2026

Disclosed IT load in the UK data centre pipeline

14 of 65 pipeline facility records (proposed, planning submitted, approved or under construction) publish a defined IT load figure, totalling 4,543 MW. The other 51 publish no defined IT load, so this is the disclosed total for these records, not an estimate for the whole UK pipeline.

Coverage: the 65 records were last checked between 1 October 2026 and 15 November 2026.

Method

Only figures defined as IT load are added. Grid connection capacity, stated electrical demand, whole-campus build-out and megawatt figures with no published definition are excluded, as are AI Growth Zone area records. Each campus is counted once, using its largest single figure. This is the same rule as the tracker totals; see the research methodology.

Supporting profiles

Link to this finding

  1. Devon Data Campus (Xlinks), near Great Torrington

    Torridge District Council defended its May 2025 letter supporting the AI Growth Zone expression of interest, which came to light through campaigners' FOI requests; it says the letter did not back the specific data centre or site.

    Source
  2. East Havering Data Centre Campus, North Ockendon

    Residents protested against the campus in North Ockendon.

    Source
  3. DataVita DV4, Chapelhall

    DataVita told the Guardian its Chapelhall data centres will be "fully grid served", with renewables bought through a power purchase agreement, replacing the earlier pledge of more than 1GW of private-wire renewables.

    Source
  4. DataVita DV3, Chapelhall

    DataVita told the Guardian its Chapelhall data centres will be "fully grid served", with renewables bought through a power purchase agreement, replacing the earlier pledge of more than 1GW of private-wire renewables.

    Source
  5. Lanarkshire AI Growth Zone

    DataVita told the Guardian its Chapelhall data centres will be "fully grid served", with renewables bought through a power purchase agreement, replacing the earlier pledge of more than 1GW of private-wire renewables.

    Source
  6. Hilfield Park data centre campus (former Mercure Hotel, Tylers Way), Hertsmere (Ark Data Centres)

    Hertsmere planning committee deferred its decision to seek more evidence on water supply from Affinity Water, further Section 106 talks and more on height and design.

    Source
  7. AiOnX Cambridge Innovation Campus, Elean Business Park, Sutton

    East Cambridgeshire district councillor raises concerns over SWI Group's plans to scale the Elean Business Park campus up to a reported 330MW.

    Source
  8. Durham Technology Park (Tract), Murton / South Hetton

    Tract announces its first UK project, a campus of up to 500MW near Murton, County Durham, with a planning application planned for December 2026.

    Source
  9. Era4 AI data centre, Erin Landfill, Chesterfield

    Fireworks AI contracts 5MW of Nvidia Blackwell Ultra capacity at Era4's Chesterfield data centre.

    Source
  10. Telehouse Inventory Estate data centre, East India Dock

    KDDI and Telehouse confirm the purchase of the Inventory Estate for more than £220m, with 65MVA of power reported secured.

    Source
  11. Sembcorp Wilton International Data Centre (phase 1), former Invista site, Wilton

    Planning permission granted under delegated powers.

    Source
  12. Hilfield Park data centre campus (former Mercure Hotel, Tylers Way), Hertsmere (Ark Data Centres)

    Officers recommend approval; planning committee to decide on 5 Nov 2026 (1,184 objections).

    Source
  13. Teesworks data centre campus (former Redcar Sinter Plant), Redcar

    National Grid agrees to buy 73.3 acres at Dorman Point for a ~1.44 GW 400 kV substation to serve the data centre

    Source
  14. Cambois data centre campus

    Quod, for Renaissance Land and QTS, applied for non-material amendments to the approved plans in the phase 1 reserved matters permission.

    Source
  15. Cardiff East Park and Ride data centre campus (Curtis Hall), Llanrumney

    Temporary gas energy centre (up to about 49.9MW, 2028 to 2033) reported while the 150MW grid connection is awaited.

    Source
  16. Nscale Loughton sovereign AI data centre

    Microsoft ends its agreement to anchor the Loughton site after grid power slipped into the 2030s. Nscale says it is still committed and is looking at alternative power sources.

    Source
  17. Longmarsh Green Energy data centre campus, Tilney St Lawrence and Fincham, West Norfolk

    EPL Norfolk Limited unveils Longmarsh Green Energy (data centre and solar farm) and opens public consultation running to 26 Nov 2026.

    Source
  18. Era4 AI data centre, Shelford Landfill, Broad Oak, Sturry, Canterbury

    Canterbury City Council planning committee approves the scheme (4 for, 1 against, 3 abstentions); decision notice not yet seen.

    Source
  19. Bryn Coch Business Park data centre (former Ferodo factory), Griffith's Crossing, Caernarfon

    Rally held against the scheme; a petition opposing it had passed 22,000 signatures.

    Source
  20. Ark Spring Park campus extension (Westwells Road), Neston, Corsham

    Legal agreements linked to the planning permission reported as signed, allowing construction to begin.

    Source
  21. Spodegreen Data Centre, Little Bollington

    Residents raise concerns over the scale of the scheme and its green belt location, DCD reports.

    Source
  22. Caineal AI data centre, A127 / Old Nevendon Road, Wickford

    Surveyors reported on site; no construction start date announced.

    Source
  23. Skelton Grange, Leeds

    Petition against the scheme reported at more than 44,000 signatures, after about 250 people joined a Millennium Square protest organised by No Leeds Data Centre. West Yorkshire Mayor Tracy Brabin backed the scheme on economic grounds; Green group leader Cllr Penny Stables warned it would mean burning more gas.

    Source
  24. Spodegreen Data Centre, Little Bollington

    First public consultation drop-in held at High Legh Village Hall. Innova expects to apply to Cheshire East Council in late 2026 or early 2027.

    Source
  25. CX Technology Campus, Chapelcross

    Application for planning permission in principle reported as submitted to Dumfries and Galloway Council (exact lodging date not confirmed).

    Source
  26. Manor Farm West, west of Poyle Trading Estate (three data centres)

    Plans for three data centres (199MW reported) submitted to Slough Borough Council, with a separate cable-route application to Laleham substation.

    Source
  27. Amazon Data Services, Ridgeway Distribution Centre, Iver

    Buckinghamshire Council approves the scheme subject to conditions and a legal agreement.

    Source
  28. Devon Data Campus (Xlinks), near Great Torrington

    Public consultation postponed amid growing local opposition; no application submitted yet.

    Source
  29. Thames Valley Park Data Centre, Earley

    Outline application for a 72MW data centre reported as submitted to Wokingham Borough Council in late September 2026 (exact lodging date not confirmed). A decision is expected by March 2027.

    Source
  30. Nscale Loughton sovereign AI data centre

    Guardian reports UK Power Networks cannot supply the requested 90MW until the early-to-mid 2030s; 2027 launch expected to slip.

    Source
  31. Bryn Coch Business Park data centre (former Ferodo factory), Griffith's Crossing, Caernarfon

    Environmental Statement notice published for C25/0740/20/EIA; representations invited until 17 Oct 2026.

    Source
  32. Cardiff East Park and Ride data centre campus (Curtis Hall), Llanrumney

    Welsh Government holding direction reported: Cardiff Council cannot grant 26/00109/HYB while ministers consider calling it in.

    Source
  33. Pure DC LON01 B2, Brent Cross

    Glencar began piling for the west shell of the 70MW LON01 B2 building.

    Source
  34. DataVita DV4, Chapelhall

    DataVita submitted a planning permission in principle application for DV4 (£849.6m).

    Source
  35. Skelton Grange, Leeds

    A 38 Degrees petition opposing the scheme passed 39,000 signatures; 993 formal objections reported.

    Source
  36. DataVita DV3, Chapelhall

    DataVita announced a £300m debt facility covering the DV1 expansion and DV3 construction, including a National Wealth Fund guarantee.

    Source
  37. Lanarkshire AI Growth Zone

    £300m debt facility and Dell's Scottish base announced for the zone.

    Source
  38. DataVita DV1, Chapelhall

    c.£300m debt facility secured to expand DV1 and build DV3, with £202m National Wealth Fund guarantee

    Source
  39. 1 Redheughs Avenue data centre, South Gyle

    Scottish Ministers recalled the appeal; it is now being decided by Ministers rather than the reporter.

    Source
  40. South Wales AI Growth Zone

    Vantage announced Nebius as the first commercial capacity commitment in the zone, at Newport.

    Source
  41. Amazon Data Services, Ridgeway Distribution Centre, Iver

    Environment Agency advertises generator permit application EPR/TP3621MM/A001.

    Source
  42. Imperial Park campus, Newport (Vantage, formerly Next Generation Data)

    Vantage announces Nebius will deploy high-density AI capacity at the Newport campus, the first commitment in the South Wales AI Growth Zone.

    Source
  43. 1 Redheughs Avenue data centre, South Gyle

    The appellant's agent confirmed that an EIA Report will be submitted. The DPEA lists the case as on hold.

    Source
  44. Telehouse West Two, London Docklands campus

    Telehouse campus update (July 2026): piling and ground works complete ahead of schedule, ground-floor slab done, steelwork started.

    Source
  45. 1 Redheughs Avenue data centre, South Gyle

    The DPEA issued an environmental impact assessment screening direction for the appeal.

    Source
  46. Conesby Data Centre Campus, Normanby Road, near Scunthorpe (Rivington Energy)

    Flixborough Parish Council minutes record the scheme as still at pre-application stage, with an EIA screening request pending.

    Source
  47. Thames Valley Park Data Centre, Earley

    Public consultation event held at Pearson Hall, Sonning.

    Source
  48. Ebbsfleet AI Data Centre Campus, New Barn Road, Dartford (Clearstone)

    Government issued a Section 35 direction: the campus will be decided as a nationally significant project through a Development Consent Order.

    Source
  49. Mwyndy Cross data centre, land east of A4119, Pontyclun

    Rhondda Cynon Taf council planning notice (dated 22 Jun 2026) advertises application 26/0404/FUL for a 21,490 sq m data centre by Talbot Green Developments Ltd.

    Source
  50. Mwyndy Cross data centre, land east of A4119, Pontyclun

    Rhondda Cynon Taf Council validates full application 26/0404/FUL for a 21,490 sq m data centre at Mwyndy Cross.

    Source
  51. Data Centre Campus, Ampthill Road, Bedford

    Section 35 direction granted: the scheme is to be treated as nationally significant infrastructure needing a Development Consent Order.

    Source
  52. Manor Farm and land north of Wraysbury Reservoir

    The Secretary of State allowed the appeal, subject to conditions (APP/J0350/W/25/3366043).

    Source
  53. SDC M40 Campus, Wapseys Wood landfill, Gerrards Cross

    Planning Inspectorate issues scoping opinion for SDC M40 Campus (EN0110030); DCO application expected Jan 2027.

    Source
  54. Ark Longcross Park data centre campus, Longcross Garden Village, Chertsey

    Ark announces new building (LP02, 36 MW) and extensions at Longcross; £807m investment

    Source
  55. Pure DC LON01 B2, Brent Cross

    Pure DC appointed Glencar to deliver the final build phase of LON01 (B2), due for completion in Q2 2029.

    Source
  56. Deep Green Bradford, Listerhills Road

    City of Bradford MDC granted permission subject to a Unilateral Undertaking (25/02212/MAF).

    Source
  57. CX Technology Campus, Chapelcross

    Pre-application consultation began, with events at Creca Village Hall and Victoria Hall, Annan on 12 to 13 May and 16 to 17 June 2026.

    Source
  58. Kao Data Park Royal (former Frogmore Industrial Estate)

    Kao Data announced it had acquired the former Frogmore Industrial Estate site in Park Royal for a data centre.

    Source
  59. Sembcorp Wilton International Data Centre (phase 1), former Invista site, Wilton

    Digital Reef and Sembcorp submit a full planning application for phase 1 (R/2026/0337/FFM).

    Source
  60. Conesby Data Centre Campus, Normanby Road, near Scunthorpe (Rivington Energy)

    Rivington Energy opened a pre-application consultation on the campus and adjoining solar farm, running to 31 May 2026.

    Source
  61. Skelton Grange, Leeds

    Leeds City Council Plans Panel resolved to grant permission for the Microsoft data centre, delegated to the Chief Planning Officer subject to a S106 agreement and conditions.

    Source
  62. North East England AI Growth Zone (Cobalt Park & Blyth)

    OpenAI paused Stargate UK, citing energy costs and regulation.

    Source
  63. Sembcorp Wilton International Data Centre (phase 1), former Invista site, Wilton

    Redcar and Cleveland Council decides an EIA is not required for the data centre (screening R/2026/0183/SC).

    Source
  64. 1 Redheughs Avenue data centre, South Gyle

    Shelborn Drummond lodged an appeal with the DPEA (PPA-230-2794).

    Source
  65. SDC M40 Campus, Wapseys Wood landfill, Gerrards Cross

    Section 35 direction: the campus is to be treated as a nationally significant infrastructure project (DCO route).

    Source
  66. Elsham Tech Park, former RAF Elsham Wolds

    North Lincolnshire Council Planning Committee resolved to grant outline permission PA/2025/643 in line with the officer report (minded to approve subject to National Highways' holding objection being resolved and a s106 agreement).

    Source
  67. East Havering Data Centre Campus, North Ockendon

    Planning authority opened consultation on the draft LDO (6 March to 12 April 2026).

    Source
  68. East Havering Data Centre Campus, North Ockendon

    Havering Strategic Planning Committee approved the draft Local Development Order for consultation.

    Source
  69. Premier Park data centre, Park Royal

    OPDC Planning Committee resolved on the application (25/0196/FUMOPDC).

    Source
  70. Ada Docklands Data Campus, Royal Docks

    Groundbreaking for Data Centre Buildings Two and Three and the multi-functional building; lead contractor McLaren has started piling.

    Source
  71. Pinewood South data centre, land south of Pinewood Studios, Iver Heath

    Buckinghamshire Council votes to approve the data centre campus plans, reported by DCD. Decision notice not yet seen.

    Source
  72. Amazon Web Services, Plot 3 Maylands Avenue

    Trade press reports Amazon has lodged plans with Dacorum Borough Council for a tape storage data centre at Plot 3 Maylands Avenue.

    Source
  73. Ark Spring Park campus extension (Westwells Road), Neston, Corsham

    Wiltshire Council's Strategic Planning Committee approved the extension (PL/2024/05527), subject to conditions.

    Source
  74. Cardiff East Park and Ride data centre campus (Curtis Hall), Llanrumney

    Plans reported for a data centre campus on the Cardiff East Park and Ride site, Llanrumney.

    Source
  75. 1 Redheughs Avenue data centre, South Gyle

    City of Edinburgh Council Development Management Sub-Committee refused the application, against officers' recommendation.

    Source
  76. Lanarkshire AI Growth Zone

    Lanarkshire named Scotland's AI Growth Zone, led by DataVita with CoreWeave.

    Source
  77. West London Technology Park (Woodlands Park landfill site), Iver

    High Court granted permission for judicial review; the government accepted the permission should be quashed for lack of an environmental impact assessment.

    Source
  78. Cambois data centre campus

    Reserved matters permission 25/02911/REM issued for phase 1 (data centres 1 and 2).

    Source
  79. Hilfield Park data centre campus (former Mercure Hotel, Tylers Way), Hertsmere (Ark Data Centres)

    Full application 25/1781/FUL registered by Hertsmere Borough Council (week of 15 to 28 Dec 2025).

    Source
  80. Pinewood South data centre, land south of Pinewood Studios, Iver Heath

    Buckinghamshire Council resolves to grant outline permission (up to 55,030 sqm data centre plus nature reserve), reported by Construction Briefing.

    Source
  81. Google data centre, North Weald Airfield

    Epping Forest District Council Planning Committee A voted to approve outline application EPF/0849/25 with conditions (officer recommendation: subject to a s106 legal agreement).

    Source
  82. Equinix Wexham Road (former AkzoNobel site)

    Slough Borough Council Planning Committee voted to delegate approval of Equinix's outline application (P/00072/152, up to 90,614 sqm GEA) to the Planning Manager, subject to a district heating contribution.

    Source
  83. South Wales AI Growth Zone

    South Wales named an AI Growth Zone with Vantage Data Centers and Microsoft.

    Source
  84. North Wales AI Growth Zone

    North Wales (Prosperity Parc and Trawsfynydd) named an AI Growth Zone.

    Source
  85. Hilfield Park data centre campus (former Mercure Hotel, Tylers Way), Hertsmere (Ark Data Centres)

    Ark Data Centres launches public consultation on a data centre campus on the former Mercure Hotel site.

    Source
  86. DC01UK, South Mimms

    DC01UK announced the sale of the scheme.

    Source
  87. Data centre campus, Hayes Bridge and Heathrow Interchange

    London Borough of Hillingdon approved the hybrid application (Phase 1 full, Phases 2 to 4 outline).

    Source
  88. Amazon Data Services, Ridgeway Distribution Centre, Iver

    Amazon Data Services UK files plans to replace 17 warehouse units with a data centre (ref T3PLZVESLZY00).

    Source
  89. Telehouse West Two, London Docklands campus

    Telehouse announces West Two, a nine-storey 33MW, £275m data centre at its Docklands campus, due to complete in 2028.

    Source
  90. Bryn Coch Business Park data centre (former Ferodo factory), Griffith's Crossing, Caernarfon

    Outline application validated by Cyngor Gwynedd, as reported by the Daily Post.

    Source
  91. Vantage Bridgend campus (former Ford engine plant)

    Bridgend County Borough Council Development Control Committee approved the hybrid application (P/25/247/HYB).

    Source
  92. Caineal AI data centre, A127 / Old Nevendon Road, Wickford

    Basildon Council's planning committee resolved to grant permission for the £1.3bn data centre.

    Source
  93. Bryn Coch Business Park data centre (former Ferodo factory), Griffith's Crossing, Caernarfon

    Planning notice published for an outline application by Gwelyfenai Limited for data centre development on the former Ferodo factory site.

    Source
  94. North East England AI Growth Zone (Cobalt Park & Blyth)

    North East England (Cobalt Park and Blyth) named an AI Growth Zone alongside the UK-US Tech Prosperity Deal.

    Source
  95. Prosperity Parc, Holyhead (Anglesey)

    Isle of Anglesey County Council granted outline planning permission (OP/2025/2).

    Source
  96. 45 Maylands Avenue, Hemel Hempstead

    Outline planning approval reported for a 5,000 sqm data centre at 45 Maylands Avenue.

    Source
  97. Equinix Slough campus (LD4 to LD7, LD14), Slough Trading Estate

    Environment Agency grants variation EPR/LP3303PR/V004 to the Slough campus permit, adding the new LD14 building with 12 new standby generators.

    Source
  98. Teesworks data centre campus (former Redcar Sinter Plant), Redcar

    Redcar and Cleveland Council grants reserved matters R/2025/0382/ESM for the data centre campus

    Source
  99. Data centre, former White's Reclamation Site, Eccles

    Salford City Council issued the decision notice: approved with conditions (PA/2024/1810).

    Source
  100. West London Technology Park (Woodlands Park landfill site), Iver

    Secretary of State allowed the appeal, treating the site as grey belt.

    Source
  101. Pinewood South data centre, land south of Pinewood Studios, Iver Heath

    Pinewood Group submits outline planning application to Buckinghamshire Council for a data centre on land south of Pinewood Studios.

    Source
  102. Haspielaw Farm, Hamilton

    South Lanarkshire Council issued an EIA screening opinion: environmental impact assessment required (P/25/0490).

    Source
  103. Digital Realty Crawley

    Environment Agency issued an environmental permit (EPR/EP3022ST/A001).

    Source
  104. Land off Bedmond Road data centre, Abbots Langley

    Secretary of State allowed the recovered appeal and granted outline permission.

    Source
  105. Cambois data centre campus

    Northumberland County Council permitted the outline application (24/04112/OUTES).

    Source
  106. Cobalt Data Centre Campus (Stellium)

    North Tyneside Council permitted the application (24/01678/FULM).

    Source
  107. Kao Data Harlow, Plot F (KLON-07 and KLON-08)

    Harlow Council confirmed that KLON-07 and KLON-08 on Plot F comply with the London Road (North) Local Development Order (HW/LDOC/25/00111).

    Source
  108. Rover Way energy park and data centre, Splott

    Cardiff Council granted permission (24/00624/FUL).

    Source
  109. Ada Docklands Data Campus, Royal Docks

    Newham Council advertised reserved matters applications 25/00541/REM (Zone 2) and 25/00542/REM (Zone 3) for data centre buildings under hybrid permission 23/01697/OUT, Former Paint Factory and Central Thameside West, North Woolwich Road.

    Source
  110. Yondr London campus (former Uxbridge Road gas works and AkzoNobel paint factory), Slough

    Ground broken on Building 3 (40 MW)

    Source
  111. Data centre, former White's Reclamation Site, Eccles

    Salford City Council Planning Panel considered the application and resolved to approve; decision notice issued 23 July 2025.

    Source
  112. DC01UK, South Mimms

    Hertsmere Borough Council planning committee granted outline permission.

    Source
  113. Culham AI Growth Zone

    Culham named the UK's first AI Growth Zone in the AI Opportunities Action Plan.

    Source
  114. Court Lane Industrial Estate data centre, Iver

    Secretary of State allowed the recovered appeal and granted outline permission.

    Source
  115. Bidder Street data centre, Canning Town

    Newham's Strategic Development Committee unanimously approved the Bidder Street data centre.

    Source
  116. GreenScale Derry Campus (formerly Atlantic Hub), Foyle Port

    Derry City and Strabane District Council granted reserved matters (LA11/2023/1729/RM) on 9 October 2024 to Atlantic Hub Property Limited.

    Source
  117. Microsoft Newport Imperial Park (CWL01), former Quinn Radiators site

    Reported: Microsoft to fund £104,000 of walking and cycling routes on Celtic Way under the planning agreement for the data centre.

    Source
  118. DC01UK, South Mimms

    Outline application submitted to Hertsmere Borough Council.

    Source
  119. Humber Tech Park, land south of the A160, South Killingholme

    North Lincolnshire Council planning committee approves outline application PA/2024/584

    Source
  120. Yondr London campus (former Uxbridge Road gas works and AkzoNobel paint factory), Slough

    Slough Borough Council grants permission for Building C (40 MW, four data halls)

    Source
  121. Microsoft Newport Imperial Park (CWL01), former Quinn Radiators site

    Newport City Council's planning committee unanimously approved application 24/0006: demolition of the remaining Quinn Radiators buildings and two data centre buildings with backup generators.

    Source
  122. West London Technology Park (Woodlands Park landfill site), Iver

    Buckinghamshire Council refused the second application (PL/24/0754/OA) for up to 72,000 sqm.

    Source
  123. Vantage CWL2 campus, Bro Tathan, St Athan

    Vale of Glamorgan planning committee resolved to approve the data centre (2023/00780/FUL), subject to a Section 106 agreement.

    Source
  124. Google Waltham Cross data centre

    Environment Agency advertised bespoke permit application EPR/ZP3128SD/A001 by Global Infrastructure UK Limited (combustion plant over 50MWth) for the data centre at Maxwells Farm West, Cheshunt EN8 8XH.

    Source
  125. Kao Data Kenwood Point, Stockport

    Approved at Stockport Council's Heatons and Reddish Area Committee (DC/090411).

    Source
  126. Land off Bedmond Road data centre, Abbots Langley

    Three Rivers District Council refused outline permission (23/1068/OUT).

    Source
  127. Kao Data Harlow campus (KLON-01 to KLON-03), London Road, Harlow

    KLON-02 (10 MW) completed, commissioned and operational

    Source
  128. West London Technology Park (Woodlands Park landfill site), Iver

    Secretary of State dismissed the appeal for the first, larger data centre scheme on green belt grounds.

    Source
  129. Equinix LD8, London Docklands

    Environment Agency issued an environmental permit (EPR/DP3906BE/A001).

    Source
  130. Court Lane Industrial Estate data centre, Iver

    Buckinghamshire Council refused outline permission (PL/22/4145/OA).

    Source
  131. Telehouse Inventory Estate data centre, East India Dock

    Planning inspector allows the appeal against Tower Hamlets' refusal, granting outline consent including a data centre at the Inventory Estate (decision dated 12 October 2023).

    Source
  132. Microsoft Newport Imperial Park (CWL01), former Quinn Radiators site

    Microsoft confirmed plans for a datacentre on the former Quinn Radiators site at Imperial Park and began pre-application consultation.

    Source
  133. Teledata Wythenshawe

    Manchester City Council approved the 45,000 sq ft facility (137424/FO/2023, reported).

    Source
  134. Google Waltham Cross data centre

    Broxbourne Planning and Regulatory Committee resolved to grant reserved matters 07/23/0361/RM for the data centre (Phase 3, Maxwells Farm West) under outline 07/18/1181/O, subject to drainage, noise and air quality matters and a unilateral obligation.

    Source
  135. Data centre campus, Tudor Works, Hayes

    Colt DCS announced groundbreaking on London 4 at Hayes.

    Source
  136. East Havering Data Centre Campus, North Ockendon

    Havering Cabinet agreed that officers and Digital Reef should keep developing the East Havering data centre proposals (then £5.3bn).

    Source
  137. Data centre campus, Tudor Works, Hayes

    London Borough of Hillingdon approved the application (38421/APP/2021/4045).

    Source
  138. Kao Data Harlow campus (KLON-01 to KLON-03), London Road, Harlow

    Construction of KLON-02 begins

    Source
  139. VIRTUS Stockley Park campus

    Environment Agency permit granted for London 5 and London 6; refused in part for London 7 and London 8.

    Source
  140. NTT London 1 data centre, Yew Tree Avenue, Dagenham

    London 1A (first building) opens: 12,800 sqm, 32 MW IT load

    Source
  141. Equinix Wexham Road (former AkzoNobel site)

    Outline permission P/00072/096 granted for mixed-use redevelopment of the former AkzoNobel site (an earlier scheme, before Equinix bought the site).

    Source
  142. Imperial Park campus, Newport (Vantage, formerly Next Generation Data)

    Vantage Data Centers agreed to acquire the NGD campus in Newport.

    Source
  143. Global Switch London

    Environment Agency issued an environmental permit (EPR/BP3530YR/A001).

    Source
  144. Digital Realty Woking data centre

    Environment Agency publishes environmental permit EPR/TP3530DV issued to Digital Realty (UK) Limited for the GU21 3BA site.

    Source
  145. Carlton Park Data Centre 1 & 2, Narborough

    Environment Agency publishes environmental permit EPR/QP3533ED/A001 issued to Santander UK plc for standby generation at LE19 0AL.

    Source