Back to the tracker

Manor Farm and land north of Wraysbury Reservoir

Slough, South EastApprovedData centre72 MW (IT load) Verified — 1 source on file

Recovered appeal allowed by the Secretary of State. The end operator is not identified in the decision letter and no capacity figure is given. Battery storage is co-located.

Project detail

Operator / developer
Not published
Location
Slough, South East, United Kingdom
Status
Approved
AI relevance
Not stated
Announced
Not published
Target live date
Not published
Published capacity
  • 72 MW Published IT loadThe IT load the operator or planning documents state the facility will draw.
Floor area
Not published
Stated investment
Not published
Power
The Inspector's Report accompanying the Secretary of State's decision records that the appellant designed the data centre to deliver an IT capacity of around 72 MW. The consented scheme also includes a battery energy storage system with a 100 MW capacity, which stores electricity and is not data centre load. No grid connection capacity is published.
Grid connection
Not published
Cooling
Not published
Water
Not published
Planning authority
Ministry of Housing, Communities and Local Government (recovered appeal)
Planning reference
P/10076/013; APP/J0350/W/25/3366043
Planning decision
Appeal allowed by the Secretary of State, subject to conditions
Decision date
2026-06-10
Construction start
Not published
Expected completion
Not published
Operational since
Not published
Confidence
Medium confidence
Last verified
2026-08-18

Sources

Entry last updated 18/08/2026. Spotted something wrong? Tell us.

South East in context

See every tracked project in South East, the capacity that has been disclosed there and how it connects to wider UK demand.