Back to the tracker

Manor Farm and land north of Wraysbury Reservoir

Slough, South EastApproved Verified

Recovered appeal (ref 3366043) allowed on 10 June 2026 by the Minister of State for Housing and Planning on behalf of the Secretary of State, granting planning permission subject to conditions. The appellant is Manor Farm Propco Limited, a subsidiary of Tritax Big Box REIT; the end operator is not identified. The decision letter and Inspector's Report record 72 MW of proposed data-centre IT capacity, together with a co-located 100 MW battery energy storage system.

Key facts

Operator / developer
Manor Farm Propco Limited
Location
Poyle Road, Slough, SL3 0AA, South East, United Kingdom
Status
Approved
Facility type
Data centre
AI relevance
Not stated

Power & grid

Published capacity
  • 72 MW — Published IT loadThe IT load the operator or planning documents state the facility will draw.
Share of UK tracked capacity
2% of published it load
Grid position
Private-wire connection to Iver and Laleham substations, through separate EDF applications; no connection date stated
Power
The Inspector's Report accompanying the Secretary of State's decision records that the appellant designed the data centre to deliver an IT capacity of around 72 MW. The consented scheme also includes a battery energy storage system with a 100 MW capacity, which stores electricity and is not data centre load. No grid connection capacity is published.
Backup fuel
Diesel
On-site generation
47 diesel backup generators; a 100MW battery energy storage system is part of the scheme (Inspector's report).

Planning

Planning route
Local planning (TCPA)
Planning reference
P/10076/013; APP/J0350/W/25/3366043
Planning decision
Appeal allowed by the Secretary of State, subject to conditions
Decision date
10 June 2026
Appeal status
Appeal allowed
Refusal reasons
Green belt, Other
Green belt
Yes

Benefits vs drawbacks

Benefits

  • Secretary of State gave significant weight to unmet need for data centre capacity (1,259MW unmet need identified) and to economic benefitsSource
  • 115% biodiversity net gain and landscape enhancements (moderate weight)Source
  • 100MW battery storage adds network resilienceSource

Drawbacks

  • Great weight given to harm to heritage assets (Poyle Farmhouse and The Hollies)Source
  • Green belt land (judged grey belt); moderate harm to local character and the Strategic GapSource
  • Refused by Slough Council on need, coalescence with London, Colne Valley Regional Park and Heathrow grounds; approved only on appealSource
  • 47 diesel backup generatorsSource

Timeline

  1. The Secretary of State allowed the appeal, subject to conditions (APP/J0350/W/25/3366043).

    Source

Reality Score

42Possible
How we score
Planning25/25
Grid connection0/25
Land and funding10/20
Delivery team0/15
Momentum7/15

Sources

Last verified

27 September 2026

Entering the UK data-centre market?

Our 3-week Market Entry Sprint shows which projects to chase, who buys the packages, and what to do in the next 90 days. Built on the same sourced data as this tracker.

Email me when this changes

Get an email when we update this project's published record.