Carlton Park Data Centre 1 & 2, Narborough
Santander UK Plc
Carlton Park Data Centre 1 & 2 at Narborough, Leicestershire is operated by Santander UK Plc and holds an Environment Agency environmental permit (EPR/QP3533ED) for its standby diesel and Diesel Rotary Uninterruptible Power Supply units. The permit regulates backup power generation plant only and states no figure for the data centres' IT load or grid connection, so no capacity is recorded.
Reality Score
Not yet scored
This project has no published Reality Score yet. Projects in East Midlands with a higher score (Strong evidence or Likely):
- Era4 AI data centre, Erin Landfill, Chesterfield · Strong evidence · Operational
Key facts
- Operator / developer
- Santander UK Plc
- Location
- Carlton Park, Narborough, Leicestershire, Narborough, LE19 0AL, East Midlands, United Kingdom
- Status
- Operational
- Facility type
- Data centre
- AI relevance
- Not stated
Power & grid
- Power
- Environment Agency permit EPR/QP3533ED covers emergency standby diesel generators and DRUPS units providing backup power to the two data centres. The permit does not state the site electrical load.
- Backup fuel
- Diesel
- On-site generation
- 24 standby diesel generators (12 per data centre), 4.49 MWth each, about 107.8 MWth in total; emergency use capped at 500 hours a year (EA decision document, 2016).
Planning
- Council
- Blaby District Council
Benefits vs drawbacks
Drawbacks
- 24 diesel standby generators, about 108 MWth thermal inputSource
Timeline
Environment Agency publishes environmental permit EPR/QP3533ED/A001 issued to Santander UK plc for standby generation at LE19 0AL.
Source
Sources
- Environmental permit decision document EPR/QP3533ED - Carlton Park Data Centre 1 & 2, Santander UK Plc, Narborough
Primary record · Environment Agency · accessed 2026-08-12
- LE19 0AL, Santander UK plc: environmental permit issued (EPR/QP3533ED/A001)
Secondary source · Environment Agency (GOV.UK) · 17 March 2016
Last verified
8 November 2026