Carlton Park Data Centre 1 & 2, Narborough
Santander UK Plc
Narborough, East MidlandsOperationalData centreCapacity not published Verified — 1 source on file
Carlton Park Data Centre 1 & 2 at Narborough, Leicestershire is operated by Santander UK Plc and holds an Environment Agency environmental permit (EPR/QP3533ED) for its standby diesel and Diesel Rotary Uninterruptible Power Supply units. The permit regulates backup power generation plant only and states no figure for the data centres' IT load or grid connection, so no capacity is recorded.
Project detail
- Operator / developer
- Santander UK Plc
- Location
- Narborough, East Midlands, United Kingdom
- Status
- Operational
- AI relevance
- Not stated
- Announced
- Not published
- Target live date
- Not published
- Published capacity
- Not published. No capacity figure means none has been published — it does not mean zero.
- Floor area
- Not published
- Stated investment
- Not published
- Power
- Environment Agency permit EPR/QP3533ED covers emergency standby diesel generators and DRUPS units providing backup power to the two data centres. The permit does not state the site electrical load.
- Grid connection
- Not published
- Cooling
- Not published
- Water
- Not published
- Planning authority
- Not published
- Planning reference
- Not published
- Planning decision
- Not published
- Decision date
- Not published
- Construction start
- Not published
- Expected completion
- Not published
- Operational since
- Not published
- Confidence
- Medium confidence
- Last verified
- 2026-08-12
Sources
- Environmental permit decision document EPR/QP3533ED - Carlton Park Data Centre 1 & 2, Santander UK Plc, Narborough
Primary record · Environment Agency · accessed 2026-08-12
Entry last updated 12/08/2026. Spotted something wrong? Tell us.