Back to the tracker

Carlton Park Data Centre 1 & 2, Narborough

Santander UK Plc

Narborough, East MidlandsOperational Verified

Carlton Park Data Centre 1 & 2 at Narborough, Leicestershire is operated by Santander UK Plc and holds an Environment Agency environmental permit (EPR/QP3533ED) for its standby diesel and Diesel Rotary Uninterruptible Power Supply units. The permit regulates backup power generation plant only and states no figure for the data centres' IT load or grid connection, so no capacity is recorded.

Reality Score

Not yet scored

This project has no published Reality Score yet. Projects in East Midlands with a higher score (Strong evidence or Likely):

Request a sample report on higher-scoring projects →

Key facts

Operator / developer
Santander UK Plc
Location
Carlton Park, Narborough, Leicestershire, Narborough, LE19 0AL, East Midlands, United Kingdom
Status
Operational
Facility type
Data centre
AI relevance
Not stated

Power & grid

Power
Environment Agency permit EPR/QP3533ED covers emergency standby diesel generators and DRUPS units providing backup power to the two data centres. The permit does not state the site electrical load.
Backup fuel
Diesel
On-site generation
24 standby diesel generators (12 per data centre), 4.49 MWth each, about 107.8 MWth in total; emergency use capped at 500 hours a year (EA decision document, 2016).

Planning

Benefits vs drawbacks

Drawbacks

  • 24 diesel standby generators, about 108 MWth thermal inputSource

Timeline

  1. Environment Agency publishes environmental permit EPR/QP3533ED/A001 issued to Santander UK plc for standby generation at LE19 0AL.

    Source

Sources

Last verified

8 November 2026

Email me when this changes

Get an email when we update this project's published record.