Carlton Park Data Centre 1 & 2, Narborough

Santander UK Plc

Narborough, East MidlandsOperational Verified

Carlton Park Data Centre 1 & 2 at Narborough, Leicestershire is operated by Santander UK Plc and holds an Environment Agency environmental permit (EPR/QP3533ED) for its standby diesel and Diesel Rotary Uninterruptible Power Supply units. The permit regulates backup power generation plant only and states no figure for the data centres' IT load or grid connection, so no capacity is recorded.

Key facts

Operator / developer
Santander UK Plc
Location
Carlton Park, Narborough, Leicestershire, Narborough, LE19 0AL, East Midlands, United Kingdom
Status
Operational
Facility type
Data centre
AI relevance
Not stated

Power & grid

Power
Environment Agency permit EPR/QP3533ED covers emergency standby diesel generators and DRUPS units providing backup power to the two data centres. The permit does not state the site electrical load.
Backup fuel
Diesel
On-site generation
24 standby diesel generators (12 per data centre), 4.49 MWth each, about 107.8 MWth in total; emergency use capped at 500 hours a year (EA decision document, 2016).

Planning

Benefits vs drawbacks

Drawbacks

  • 24 diesel standby generators, about 108 MWth thermal inputSource

Sources

Last verified

23 September 2026

Entering the UK data-centre market?

Our 3-week Market Entry Sprint shows which projects to chase, who buys the packages, and what to do in the next 90 days. Built on the same sourced data as this tracker.

Email me when this changes

Get an email when we update this project's published record.