Data centre campus, Tudor Works, Hayes

Colt Data Centre Services

Hayes, LondonUnder construction Verified

The London Borough of Hillingdon approved application 38421/APP/2021/4045 on 26 April 2022 for redevelopment of the Tudor Works site at Beaconsfield Road, Hayes, by Colt Data Centre Services, to deliver a data centre campus of two buildings (Use Class B8) with associated energy and electricity infrastructure, plant, a security gatehouse, highway works, parking, landscaping and ancillary office use. Colt broke ground on the first building, London 4, in February 2023 and describes it as under construction with 31 MW of IT power; that operator figure is recorded here as IT load. The council register itself states no electrical capacity.

Key facts

Operator / developer
Colt Data Centre Services
Location
Land at Tudor Works, Beaconsfield Road, Hayes, Hayes, UB4 0SL, London, United Kingdom
Status
Under construction
Facility type
Data centre
AI relevance
Not stated

Power & grid

Published capacity
  • 31 MW — Published IT loadThe IT load the operator or planning documents state the facility will draw.
Share of UK tracked capacity
0.9% of published it load
Backup fuel
Mixed
On-site generation
44 emergency standby generators across two buildings (Rolls-Royce MTU), about 283 MW thermal input in total, running on diesel or HVO with SCR NOx abatement; about 20 hours of testing per generator per year (EA permit application, Mar 2024).

Planning

Planning route
Local planning (TCPA)
Planning reference
38421/APP/2021/4045
Planning decision
Approval
Decision date
26 April 2022

Benefits vs drawbacks

Benefits

  • 31MW of IT capacity on a reused former data centre siteSource
  • Standby generators fitted with SCR to cut NOx; standby only, with no plans to sell powerSource

Drawbacks

  • 44 standby generators, about 283 MW thermal input, on diesel or HVOSource
  • Phase 1 was due in 2025; operator page still shows it as under constructionSource

Timeline

  1. London Borough of Hillingdon approved the application (38421/APP/2021/4045).

    Source
  2. Colt DCS announced groundbreaking on London 4 at Hayes.

    Source

Reality Score

75Likely
How we score
Planning25/25
Grid connection0/25
Land and funding20/20
Delivery team15/15
Momentum15/15

Sources

Last verified

27 September 2026

Entering the UK data-centre market?

Our 3-week Market Entry Sprint shows which projects to chase, who buys the packages, and what to do in the next 90 days. Built on the same sourced data as this tracker.

Email me when this changes

Get an email when we update this project's published record.