Uxbridge, LondonOperationalData centreCapacity not published Verified — 1 source on file
Campus counted as one project. London 5 and 6 are permitted and operational; the permit was refused in part for London 7 and 8. That refusal is of the environmental permit, not necessarily of planning consent.
Project detail
- Operator / developer
- VIRTUS Data Centres
- Location
- Uxbridge, London, United Kingdom
- Status
- Operational
- AI relevance
- Not stated
- Announced
- Not published
- Target live date
- Not published
- Published capacity
- Not published. No capacity figure means none has been published — it does not mean zero.
- Floor area
- Not published
- Stated investment
- Not published
- Power
- Not published
- Grid connection
- Not published
- Cooling
- Not published
- Water
- Not published
- Planning authority
- London Borough of Hillingdon
- Planning reference
- EPR/AP3903PD/A001 (environmental permit)
- Planning decision
- Permit granted for London 5 and London 6; refused in part for London 7 and London 8
- Decision date
- 2021-11-16
- Construction start
- Not published
- Expected completion
- Not published
- Operational since
- Not published
- Confidence
- Medium confidence
- Last verified
- 2026-08-12
Sources
- Decision document EPR/AP3903PD/A001
Secondary source · Environment Agency · 2021-11-16
Entry last updated 12/08/2026. Spotted something wrong? Tell us.
London in context
See every tracked project in London, the capacity that has been disclosed there and how it connects to wider UK demand.