Pure DC LON01 B2, Brent Cross

Pure Data Centres Group

London (Brent Cross), LondonUnder construction

The second and final building at Pure DC's LON01 campus at Brent Cross, north London, adding more than 23,000 sqm and taking the campus to 90MW. Glencar is the general contractor and began piling for the west shell in September 2026. Completion of B2 is scheduled for Q2 2029.

Reality Score

75Likely
How we score
Planning25/25
Grid connection0/25
Land and funding20/20
Delivery team15/15
Momentum15/15

Main contractor and M&E routes are forming.

Supplying this project? See the Market Entry Sprint →

Key facts

Operator / developer
Pure Data Centres Group
Location
London (Brent Cross), London, United Kingdom
Status
Under construction
Facility type
Data centre
AI relevance
Not stated

Power & grid

Published capacity
  • 70 MW — Reported capacity, definition not publishedA megawatt figure was reported but the source does not define what it measures, so it is excluded from every total.
Power
Pure DC describes B2 as a 70MW facility and the campus total as 90MW, with the existing B1 building at 20MW. It does not say whether these are IT load figures, so no IT load is recorded.

Planning

Planning route
Local planning (TCPA)
Planning decision
Planning permission granted in 2025 (reported by DCD; reference not yet recorded)

Timeline

  1. Pure DC appointed Glencar to deliver the final build phase of LON01 (B2), due for completion in Q2 2029.

    Source
  2. Glencar began piling for the west shell of the 70MW LON01 B2 building.

    Source

Sources

Last verified

13 October 2026

Entering the UK data-centre market?

Our 3-week Market Entry Sprint shows which projects to chase, who buys the packages, and what to do in the next 90 days. Built on the same sourced data as this tracker.

Email me when this changes

Get an email when we update this project's published record.