A £1.9bn data centre campus by Washington DC-based CloudHQ on 37.5 acres of the former Didcot A power station grounds, welcomed by the Technology Secretary in October 2024. CloudHQ describes it as fully permitted and powered, with 101 MW of critical IT load, expandable to 300 MW, and 2.25m sq ft of space. The BBC reported 1,500 construction jobs and 100 permanent roles. Separate from Amazon's Didcot North campus on the same former power station site.

Reality Score

Not yet scored

This project has no published Reality Score yet. Projects in South East with a higher score (Strong evidence or Likely):

Request a sample report on higher-scoring projects →

Key facts

Operator / developer
CloudHQ
Location
Didcot, South East, United Kingdom
Status
Approved
Facility type
Data centre
AI relevance
Not stated
Floor area
209,032 m²
Stated investment
£1,900,000,000
Construction jobs
1,500
Permanent jobs
100

Power & grid

Published capacity
  • 101 MW — Published IT loadThe IT load the operator or planning documents state the facility will draw.
Share of UK tracked capacity
2.1% of published it load
Power
CloudHQ states 101 MW of critical IT load, expandable to 300 MW.

Planning

Planning decision
Described by CloudHQ as fully permitted and powered; planning reference not retrieved