SDC M40 Campus, Wapseys Wood landfill, Gerrards Cross

Gerrards Cross, South EastProposed

Slough Holdings UK Limited, owned by funds managed by SDC Capital Partners, proposes a data centre campus of up to three buildings with an IT load of up to about 300MW on the Wapseys Wood landfill site between Gerrards Cross and Beaconsfield. An on-site gas-fired energy centre of about 250 to 350MW would power the campus, at least at first. Veolia owns the energy centre land and is the energy partner. The Secretary of State directed on 16 March 2026 that the scheme be treated as a nationally significant infrastructure project. The Planning Inspectorate published a scoping opinion on 9 June 2026 and expects the application in January 2027.

Reality Score

17Headline only
How we score
Planning0/25
Grid connection0/25
Land and funding10/20
Delivery team0/15
Momentum7/15

Not buying yet. These projects in South East score Building or Likely:

Get the list of projects buying now →

Key facts

Operator / developer
Slough Holdings UK Limited (SDC Capital Partners funds)
Location
Gerrards Cross, South East, United Kingdom
Status
Proposed
Facility type
Data centre
AI relevance
Not stated

Power & grid

Published capacity
  • 300 MW — Published IT loadThe IT load the operator or planning documents state the facility will draw.
Share of UK tracked capacity
6.9% of published it load
Power
IT load up to c.300MW (about 100MW per building). No grid connection offer evidenced; an existing 400kV overhead line crosses the site and a future grid connection is described only as a scenario.
On-site generation
On-site gas energy centre c.250-350MW using the existing on-site gas pipeline (gas connection up to c.900MW); described as hydrogen-ready.

Planning

Planning route
DCO / NSIP
Planning reference
EN0110030 (Planning Inspectorate)
Planning decision
Section 35 direction 16 Mar 2026; scoping opinion 9 Jun 2026; DCO application expected Jan 2027. No consent.

Timeline

  1. Section 35 direction: the campus is to be treated as a nationally significant infrastructure project (DCO route).

    Source
  2. Planning Inspectorate issues scoping opinion for SDC M40 Campus (EN0110030); DCO application expected Jan 2027.

    Source

Sources

Last verified

28 October 2026

Entering the UK data-centre market?

Our 3-week Market Entry Sprint shows which projects to chase, who buys the packages, and what to do in the next 90 days. Built on the same sourced data as this tracker.

Email me when this changes