East Havering Data Centre Campus, North Ockendon

North Ockendon, LondonProposed

Digital Reef, working with Havering Council, proposes a hyperscale data centre campus of up to 400,000 sq m on green belt farmland at North Ockendon, east of the M25 on the Havering/Thurrock boundary, with a 113-hectare public ecology park, battery storage, horticulture and renewable energy facilities. The developer puts the investment at £14.7bn; press and campaigners describe it as about 600MW on about 200 hectares. Instead of a planning application, the council's planning authority is using a Local Development Order: the Strategic Planning Committee approved a draft LDO for consultation on 3 March 2026 and consultation ran from 6 March to 12 April 2026. No decision on adopting the LDO has been announced.

Reality Score

15Headline onlyStatus: Proposed
How we score
Planning8/25
Grid connection0/25
Land and funding0/20
Delivery team0/15
Momentum7/15

A Reality Score assesses the public evidence behind a project. It is not its construction status, a probability of being built or a guarantee of procurement.

Public evidence for this project is limited so far. Projects in London with a higher score (Strong evidence or Likely):

Request a sample report on higher-scoring projects →

Key facts

Operator / developer
Digital Reef
Location
North Ockendon, London, United Kingdom
Status
Proposed
Facility type
Data centre
AI relevance
Not stated
Floor area
400,000 m²
Stated investment
£14,700,000,000

Power & grid

Published capacity
  • 600 MW — Reported capacity, definition not publishedA megawatt figure was reported but the source does not define what it measures, so it is excluded from every total.

Planning

Planning route
Other planning route
Green belt
Yes

Benefits vs drawbacks

Benefits

  • 113-hectare Ecology Park open to the public, with new footpath and cycle routesSource
  • Council projects at least 9,000 jobs across construction, operation and supply chain, and about £13.5m a year in income for the councilSource

Drawbacks

  • On Metropolitan Green Belt farmland; a residents' group (NORA) is challenging itSource
  • The council is both promoting the scheme with the developer and, as planning authority, deciding the LDOSource
  • The draft LDO has not been adopted and no adoption date has been givenSource
  • No grid connection offer, operator or tenant published; 600MW figure is from press and campaigners, not the councilSource

Timeline

  1. Havering Cabinet agreed that officers and Digital Reef should keep developing the East Havering data centre proposals (then £5.3bn).

    Source
  2. Havering Strategic Planning Committee approved the draft Local Development Order for consultation.

    Source
  3. Planning authority opened consultation on the draft LDO (6 March to 12 April 2026).

    Source
  4. Residents protested against the campus in North Ockendon.

    Source

Sources

Last verified

11 November 2026

Email me when this changes

Get an email when we update this project's published record.