Deep Green Bradford, Listerhills Road
Deep Green Technologies
Bradford, Yorkshire and the HumberApproved Verified
Consent reported May 2026, with heat reuse into the Bradford Energy Centre. A 5.6 MW figure is reported without a stated definition.
Reality Score
52PossibleStatus: Approved
How we scorePlanning25/25
Grid connection0/25
Land and funding20/20
Delivery team0/15
Momentum7/15
A Reality Score assesses the public evidence behind a project. It is not its construction status, a probability of being built or a guarantee of procurement.
Early stage: worth a watching brief.
Supplying this project? Pro tells you every Monday when it moves →Key facts
- Operator / developer
- Deep Green Technologies
- Location
- Bradford, Yorkshire and the Humber, United Kingdom
- Status
- Approved
- Facility type
- Data centre
- AI relevance
- Not stated
Power & grid
- Power
- No capacity figure appears on the City of Bradford MDC register entry. Press reporting cites 5 MW as filed and 5.6 MW as approved; neither publisher states whether that is IT load, grid connection or total electrical demand, so no figure is recorded here.
- Heat reuse
- Surplus heat from a closed-loop cooling system to be supplied to the Bradford Energy Network (university and college buildings, City Hall). Up to 95% of heat reused, per Business Link Magazine.
Planning
- Planning route
- Local planning (TCPA)
- Planning reference
- 25/02212/MAF
- Planning decision
- Grant subject to Unilateral Undertaking
- Decision date
- 13 May 2026
Benefits vs drawbacks
Benefits
Timeline
City of Bradford MDC granted permission subject to a Unilateral Undertaking (25/02212/MAF).
Source
Sources
- Planning application 25/02212/MAF — Construction of data centre and associated infrastructure, Land to the East of Bradford Energy Centre, Listerhills Road
Primary record · City of Bradford Metropolitan District Council · 2026-05-13
- Bradford datacentre with heat reuse gains planning consent
Secondary source · Computer Weekly (secondary)
- Approved data centre to deliver waste heat to Bradford energy network
Secondary source · blmforum.net (secondary)
Last verified
31 October 2026