Sembcorp Wilton International Data Centre (phase 1), former Invista site, Wilton

Digital Reef

Redcar, North EastApproved Verified

Full planning permission granted on 29 October 2026 (delegated decision) for phase 1 of a data centre campus at Wilton International near Redcar: data centre buildings with power, communications and support buildings, backup generators and storage tanks. The joint venture of Digital Reef and Sembcorp says phase 1 provides up to 280MW for AI and high-performance computing. EIA was screened out in April 2026.

Reality Score

52Possible
How we score
Planning25/25
Grid connection0/25
Land and funding20/20
Delivery team0/15
Momentum7/15

Early stage: worth a watching brief.

Supplying this project? See the Market Entry Sprint →

Key facts

Operator / developer
Digital Reef
Location
Former Invista Site, Land at Wilton International, Redcar, North East, United Kingdom
Status
Approved
Facility type
Data centre
AI relevance
High — AI/compute led
Floor area
75,000 m²
Construction jobs
1,000
Permanent jobs
200

Power & grid

Grid connection
Applicant says power comes from available capacity at the existing Greystones substation to the south, with cables through existing service corridors (Place North East, May 2026). Wilton International has the UK's largest private-wire grid and four on-site generation units (Sembcorp). No connection offer or MVA figure published.
Power
Up to 280MW for phase 1 (Sembcorp/Place North East); whether this is IT load or grid demand is not stated.
Water
Roof rainwater to be reused in the cooling systems (Planning Statement).
Cooling
Air-based cooling using outside air with evaporative cooling for most hours; air-to-water chiller for exceptional conditions (Planning Statement).

Planning

Planning route
Local planning (TCPA)
Planning reference
R/2026/0337/FFM
Planning decision
Full planning permission granted 29 Oct 2026 (delegated decision, R/2026/0337/FFM); decision notice not read
Decision date
29 October 2026
Land area
15.5 ha

Benefits vs drawbacks

Benefits

  • Brownfield site within an established industrial parkSource
  • 600 to 1,000 construction jobs and up to 200 permanent staff (applicant estimate)Source
  • Mainly air-based cooling with roof rainwater reused for coolingSource

Drawbacks

  • Backup generators and fuel storage tanks on siteSource
  • No grid connection offer or capacity figure publishedSource

Timeline

  1. Redcar and Cleveland Council decides an EIA is not required for the data centre (screening R/2026/0183/SC).

    Source
  2. Digital Reef and Sembcorp submit a full planning application for phase 1 (R/2026/0337/FFM).

    Source
  3. Planning permission granted under delegated powers.

    Source

Sources

Last verified

5 November 2026

Entering the UK data-centre market?

Our 3-week Market Entry Sprint shows which projects to chase, who buys the packages, and what to do in the next 90 days. Built on the same sourced data as this tracker.

Email me when this changes

Get an email when we update this project's published record.