Equinix LD8, London Docklands
Equinix
London, LondonOperationalData centreCapacity not published Verified — 1 source on file
Operational Equinix colocation facility in London Docklands (E14 9GE). The Environment Agency permit covers 64 MWth of standby generator thermal input, which is a heat input figure and not an IT-load capacity, so no capacity figure is recorded.
Project detail
- Operator / developer
- Equinix
- Location
- London, London, United Kingdom
- Status
- Operational
- AI relevance
- Not stated
- Announced
- Not published
- Target live date
- Not published
- Published capacity
- Not published. No capacity figure means none has been published — it does not mean zero.
- Floor area
- Not published
- Stated investment
- Not published
- Power
- Not published
- Grid connection
- Not published
- Cooling
- Not published
- Water
- Not published
- Planning authority
- London Borough of Tower Hamlets
- Planning reference
- EPR/DP3906BE/A001 (environmental permit)
- Planning decision
- Environmental permit issued
- Decision date
- 2023-10-27
- Construction start
- Not published
- Expected completion
- Not published
- Operational since
- Not published
- Confidence
- Medium confidence
- Last verified
- 2026-08-18
Sources
- E14 9GE, Equinix (UK) Limited: environmental permit issued - EPR/DP3906BE/A001
Secondary source · Environment Agency · 2023-10-27
Entry last updated 18/08/2026. Spotted something wrong? Tell us.
London in context
See every tracked project in London, the capacity that has been disclosed there and how it connects to wider UK demand.