London, LondonOperationalData centreCapacity not published Verified — 1 source on file

Operational Equinix colocation facility in London Docklands (E14 9GE). The Environment Agency permit covers 64 MWth of standby generator thermal input, which is a heat input figure and not an IT-load capacity, so no capacity figure is recorded.

Project detail

Operator / developer
Equinix
Location
London, London, United Kingdom
Status
Operational
AI relevance
Not stated
Announced
Not published
Target live date
Not published
Published capacity
Not published. No capacity figure means none has been published — it does not mean zero.
Floor area
Not published
Stated investment
Not published
Power
Not published
Grid connection
Not published
Cooling
Not published
Water
Not published
Planning authority
London Borough of Tower Hamlets
Planning reference
EPR/DP3906BE/A001 (environmental permit)
Planning decision
Environmental permit issued
Decision date
2023-10-27
Construction start
Not published
Expected completion
Not published
Operational since
Not published
Confidence
Medium confidence
Last verified
2026-08-18