Back to the tracker

Imperial Park campus, Newport (Vantage, formerly Next Generation Data)

Vantage Data Centers (formerly Next Generation Data)

Newport, WalesOperational

An operating colocation campus at Imperial Park, Coedkernew, near Newport, built as Next Generation Data and acquired by Vantage Data Centers in July 2020, since marketed by Vantage under its Cardiff campus branding. It is a separate site from the Vantage Bridgend scheme and from the Rover Way project in Cardiff.

Key facts

Operator / developer
Vantage Data Centers (formerly Next Generation Data)
Location
Imperial Park, Coedkernew, Newport, Wales, United Kingdom
Status
Operational
Facility type
Data centre
AI relevance
Not stated

Power & grid

Power
Published capacity figures conflict and none is defined consistently. At acquisition in 2020 the campus was described as an existing 72 MW facility with 108 MW of expansion capacity, giving 180 MW in total, with no stated definition. The operator's current campus page states 148 MW of critical IT load. A third-party directory states about 150 MW. Because the figures conflict and the 2020 figures carry no definition, no capacity figure is recorded and the campus is excluded from every total.

Planning

Benefits vs drawbacks

Benefits

  • Described at acquisition as Europe's largest data centre campus, close to one million sq ftSource
  • 180MW quoted at acquisition (72MW occupied, 108MW expansion)Source

Drawbacks

  • Published capacity figures conflict and are not defined consistentlySource

Timeline

  1. Vantage Data Centers agreed to acquire the NGD campus in Newport.

    Source

Sources

Last verified

18 August 2026

Entering the UK data-centre market?

Our 3-week Market Entry Sprint shows which projects to chase, who buys the packages, and what to do in the next 90 days. Built on the same sourced data as this tracker.

Email me when this changes

Get an email when we update this project's published record.