Back to the tracker

Imperial Park campus, Newport (Vantage, formerly Next Generation Data)

Vantage Data Centers (formerly Next Generation Data)

Newport, WalesOperational

An operating colocation campus at Imperial Park, Coedkernew, near Newport, built as Next Generation Data and acquired by Vantage Data Centers in July 2020, since marketed by Vantage under its Cardiff campus branding. It is a separate site from the Vantage Bridgend scheme and from the Rover Way project in Cardiff. In August 2026 Vantage announced that Nebius will deploy high-density AI capacity at the Newport campus, the first customer commitment in the South Wales AI Growth Zone (no MW figure published).

Newport AI data centre: which Imperial Park site is this?

This site
Vantage Data Centers' operating colocation campus at Imperial Park, Coedkernew, near Newport. It was built as Next Generation Data (NGD), acquired by Vantage in July 2020 and is now marketed under Vantage's Cardiff campus branding.Computer Weekly (secondary)
Not this site
Microsoft's data centre on the former Quinn Radiators site at Celtic Way, Imperial Park, is a separate project with its own planning approval (24/0006). Vantage's Bridgend scheme is also separate.
AI capacity
In August 2026 Vantage announced that Nebius will deploy high-density AI capacity at this campus, the first customer commitment in the South Wales AI Growth Zone. No MW figure was published.Vantage Data Centers
Capacity
Published figures conflict: 180 MW in total at the 2020 acquisition (undefined), 148 MW of critical IT load on the operator's current page and about 150 MW in a third-party directory. No figure is recorded and the campus is left out of every total.InfraVia Capital Partners (investor disclosure)
Planning and grid
No planning reference, network operator or grid connection date is recorded for this campus.

Related profiles: Microsoft Newport, Imperial Park (CWL01) · Vantage Bridgend · South Wales AI Growth Zone

Summary checked against this record on 7 November 2026. If anything differs, the detailed record and sources below take precedence. See the UK data centre map.

Reality Score

Not yet scored

This project has no published Reality Score yet. Projects in Wales with a higher score (Strong evidence or Likely):

Request a sample report on higher-scoring projects →

Key facts

Operator / developer
Vantage Data Centers (formerly Next Generation Data)
Location
Imperial Park, Coedkernew, Newport, Wales, United Kingdom
Status
Operational
Facility type
Data centre
AI relevance
High — AI/compute led

Power & grid

Power
Published capacity figures conflict and none is defined consistently. At acquisition in 2020 the campus was described as an existing 72 MW facility with 108 MW of expansion capacity, giving 180 MW in total, with no stated definition. The operator's current campus page states 148 MW of critical IT load. A third-party directory states about 150 MW. Because the figures conflict and the 2020 figures carry no definition, no capacity figure is recorded and the campus is excluded from every total.

Planning

Benefits vs drawbacks

Benefits

  • Described at acquisition as Europe's largest data centre campus, close to one million sq ftSource
  • 180MW quoted at acquisition (72MW occupied, 108MW expansion)Source

Drawbacks

  • Published capacity figures conflict and are not defined consistentlySource

Timeline

  1. Vantage Data Centers agreed to acquire the NGD campus in Newport.

    Source
  2. Vantage announces Nebius will deploy high-density AI capacity at the Newport campus, the first commitment in the South Wales AI Growth Zone.

    Source

Sources

Last verified

31 October 2026

Email me when this changes

Get an email when we update this project's published record.