Back to the tracker

Imperial Park campus, Newport (Vantage, formerly Next Generation Data)

Vantage Data Centers (formerly Next Generation Data)

Newport, WalesOperationalData centreCapacity not publishedProvisional — evidence incomplete

An operating colocation campus at Imperial Park, Coedkernew, near Newport, built as Next Generation Data and acquired by Vantage Data Centers in July 2020, since marketed by Vantage under its Cardiff campus branding. It is a separate site from the Vantage Bridgend scheme and from the Rover Way project in Cardiff.

Project detail

Operator / developer
Vantage Data Centers (formerly Next Generation Data)
Location
Newport, Wales, United Kingdom
Status
Operational
AI relevance
Not stated
Announced
Not published
Target live date
Not published
Published capacity
Not published. No capacity figure means none has been published — it does not mean zero.
Floor area
Not published
Stated investment
Not published
Power
Published capacity figures conflict and none is defined consistently. At acquisition in 2020 the campus was described as an existing 72 MW facility with 108 MW of expansion capacity, giving 180 MW in total, with no stated definition. The operator's current campus page states 148 MW of critical IT load. A third-party directory states about 150 MW. Because the figures conflict and the 2020 figures carry no definition, no capacity figure is recorded and the campus is excluded from every total.
Grid connection
Not published
Cooling
Not published
Water
Not published
Planning authority
Newport City Council
Planning reference
Not published
Planning decision
Not published
Decision date
Not published
Construction start
Not published
Expected completion
Not published
Operational since
Not published
Confidence
Medium confidence
Last verified
2026-08-18

Sources

Entry last updated 18/08/2026. Spotted something wrong? Tell us.

Wales in context

See every tracked project in Wales, the capacity that has been disclosed there and how it connects to wider UK demand.