Imperial Park campus, Newport (Vantage, formerly Next Generation Data)
Vantage Data Centers (formerly Next Generation Data)
An operating colocation campus at Imperial Park, Coedkernew, near Newport, built as Next Generation Data and acquired by Vantage Data Centers in July 2020, since marketed by Vantage under its Cardiff campus branding. It is a separate site from the Vantage Bridgend scheme and from the Rover Way project in Cardiff.
Key facts
- Operator / developer
- Vantage Data Centers (formerly Next Generation Data)
- Location
- Imperial Park, Coedkernew, Newport, Wales, United Kingdom
- Status
- Operational
- Facility type
- Data centre
- AI relevance
- Not stated
Power & grid
- Power
- Published capacity figures conflict and none is defined consistently. At acquisition in 2020 the campus was described as an existing 72 MW facility with 108 MW of expansion capacity, giving 180 MW in total, with no stated definition. The operator's current campus page states 148 MW of critical IT load. A third-party directory states about 150 MW. Because the figures conflict and the 2020 figures carry no definition, no capacity figure is recorded and the campus is excluded from every total.
Planning
- Council
- Newport City Council
Benefits vs drawbacks
Timeline
Vantage Data Centers agreed to acquire the NGD campus in Newport.
Source
Sources
- InfraVia agrees to sell its participation in NGD to Vantage Data Centers
Secondary source · InfraVia Capital Partners (investor disclosure) · 2020-04-07
- NGD's mega-colocation campus in Wales acquired by Vantage Data Centers
Secondary source · Computer Weekly (secondary) · 2020-07-27
Last verified
18 August 2026