68 mapped · 1 location not yet mapped
Location not yet mapped
- Ada Docklands Data Campus, Royal Docks · London · Under construction
UK data centre map
69 published project records: 11 operational facilities and 51 planned or under-construction facilities. Planned pipeline means proposed, planning submitted, approved or under construction; other statuses are included in the register but not the pipeline count. 5 AI Growth Zone area records are listed separately from physical facilities. As of 31 October 2026, the latest record check.
An evidence-led register, not a complete census of every UK data centre; markers are recorded locations, not site boundaries.
Data centres by region
| Region | Projects | Operational | Published IT load | Region hub |
|---|---|---|---|---|
| South East | 14 | 2 | 684 MW · 4 of 13 facilities | South East hub |
| East of England | 12 | 1 | Not published | East of England hub |
| London | 11 | 4 | 212.2 MW · 4 of 11 facilities | London hub |
| Wales | 11 | 1 | 200 MW · 1 of 9 facilities | Wales hub |
| Scotland | 6 | 0 | Not published | Scotland hub |
| North West | 4 | 1 | 40 MW · 1 of 4 facilities | North West hub |
| Yorkshire and the Humber | 4 | 0 | 1,000 MW · 1 of 4 facilities | Yorkshire and the Humber hub |
| North East | 3 | 1 | 720 MW · 1 of 2 facilities | North East hub |
| South West | 2 | 0 | 1,500 MW · 1 of 2 facilities | South West hub |
| East Midlands | 1 | 1 | Not published | East Midlands hub |
| Northern Ireland | 1 | 0 | Not published | Northern Ireland hub |
IT load totals use only defined published IT figures for physical facilities, counting each campus once; other capacity measures are not added.
Where new data centres are planned
The five largest proposed or approved projects by their largest defined published capacity figure. Measurement types are shown individually; these are not equivalent demand figures and are not summed.
- Devon Data Campus (Xlinks), near Great Torrington
South West · Proposed · 1,500 MW — published it load
- Elsham Tech Park, former RAF Elsham Wolds
Yorkshire and the Humber · Approved · 1,000 MW — published it load
- Ebbsfleet AI Data Centre Campus, New Barn Road, Dartford (Clearstone)
South East · Proposed · 300 MW — published electrical demand
- SDC M40 Campus, Wapseys Wood landfill, Gerrards Cross
South East · Proposed · 300 MW — published it load
- Data centre campus, Hayes Bridge and Heathrow Interchange
London · Approved · 250 MW — published electrical demand
Every published project
- 1 Redheughs Avenue data centre, South GyleScotland · Refused
- 45 Maylands Avenue, Hemel HempsteadEast of England · Approved
- Ada Docklands Data Campus, Royal DocksLondon · Under construction
- Amazon Data Services, Ridgeway Distribution Centre, IverSouth East · Approved
- Amazon Web Services, Plot 3 Maylands AvenueEast of England · Planning submitted
- Ark Spring Park campus extension (Westwells Road), Neston, CorshamSouth West · Approved
- Bidder Street data centre, Canning TownLondon · Approved
- Bryn Coch Business Park data centre (former Ferodo factory), Griffith's Crossing, CaernarfonWales · Planning submitted
- Caineal AI data centre, A127 / Old Nevendon Road, WickfordEast of England · Approved
- Cambois data centre campusNorth East · Under construction
- Cardiff East Park and Ride data centre campus (Curtis Hall), LlanrumneyWales · Planning submitted
- Carlton Park Data Centre 1 & 2, NarboroughEast Midlands · Operational
- Cobalt Data Centre Campus (Stellium)North East · Operational
- Conesby Data Centre Campus, Normanby Road, near Scunthorpe (Rivington Energy)Yorkshire and the Humber · Proposed
- Court Lane Industrial Estate data centre, IverSouth East · Approved
- Culham AI Growth ZoneSouth East · Approved
- CX Technology Campus, ChapelcrossScotland · Planning submitted
- Data Centre Campus, Ampthill Road, BedfordEast of England · Proposed
- Data centre campus, Hayes Bridge and Heathrow InterchangeLondon · Approved
- Data centre campus, Tudor Works, HayesLondon · Under construction
- Data centre, former White's Reclamation Site, EcclesNorth West · Approved
- DataVita DV3, ChapelhallScotland · Under construction
- DataVita DV4, ChapelhallScotland · Planning submitted
- DC01UK, South MimmsEast of England · Approved
- Deep Green Bradford, Listerhills RoadYorkshire and the Humber · Approved
- Devon Data Campus (Xlinks), near Great TorringtonSouth West · Proposed
- Digital Realty CrawleySouth East · Operational
- Digital Realty Woking data centreSouth East · Operational
- Ebbsfleet AI Data Centre Campus, New Barn Road, Dartford (Clearstone)South East · Proposed
- Elsham Tech Park, former RAF Elsham WoldsYorkshire and the Humber · Approved
- Equinix LD8, London DocklandsLondon · Operational
- Equinix Wexham Road (former AkzoNobel site)South East · Approved
- Era4 AI data centre, Shelford Landfill, Broad Oak, Sturry, CanterburySouth East · Approved
- Global Switch LondonLondon · Operational
- Google data centre, North Weald AirfieldEast of England · Approved
- Google Waltham Cross data centreEast of England · Operational
- GreenScale Derry Campus (formerly Atlantic Hub), Foyle PortNorthern Ireland · Approved
- Haspielaw Farm, HamiltonScotland · Proposed
- Hilfield Park data centre campus (former Mercure Hotel, Tylers Way), Hertsmere (Ark Data Centres)East of England · Planning submitted
- Imperial Park campus, Newport (Vantage, formerly Next Generation Data)Wales · Operational
- Kao Data Harlow, Plot F (KLON-07 and KLON-08)East of England · Approved
- Kao Data Kenwood Point, StockportNorth West · Approved
- Kao Data Park Royal (former Frogmore Industrial Estate)London · Proposed
- Lanarkshire AI Growth ZoneScotland · Approved
- Land off Bedmond Road data centre, Abbots LangleyEast of England · Approved
- Longmarsh Green Energy data centre campus, Tilney St Lawrence and Fincham, West NorfolkEast of England · Proposed
- Manor Farm and land north of Wraysbury ReservoirSouth East · Approved
- Manor Farm West, west of Poyle Trading Estate (three data centres)South East · Planning submitted
- Microsoft Newport Imperial Park (CWL01), former Quinn Radiators siteWales · Approved
- Mwyndy Cross data centre, land east of A4119, PontyclunWales · Planning submitted
- North East England AI Growth Zone (Cobalt Park & Blyth)North East · Approved
- North Wales AI Growth ZoneWales · Approved
- Nscale Loughton sovereign AI data centreEast of England · Approved
- Pinewood South data centre, land south of Pinewood Studios, Iver HeathSouth East · Approved
- Premier Park data centre, Park RoyalLondon · Approved
- Prosperity Parc, Holyhead (Anglesey)Wales · Approved
- Pure DC LON01 B2, Brent CrossLondon · Under construction
- Rover Way energy park and data centre, SplottWales · Approved
- SDC M40 Campus, Wapseys Wood landfill, Gerrards CrossSouth East · Proposed
- Skelton Grange, LeedsYorkshire and the Humber · Approved
- South Wales AI Growth ZoneWales · Approved
- Spodegreen Data Centre, Little BollingtonNorth West · Proposed
- Teledata WythenshaweNorth West · Operational
- Thames Valley Park Data Centre, EarleySouth East · Planning submitted
- Vantage Bridgend campus (former Ford engine plant)Wales · Approved
- Vantage CWL2 campus, Bro Tathan, St AthanWales · Approved
- VIRTUS LONDON1 data centre, EnfieldLondon · Operational
- VIRTUS Stockley Park campusLondon · Operational
- West London Technology Park (Woodlands Park landfill site), IverSouth East · Paused
Frequently asked questions
- Where are the UK's data centres?
- The published register covers 69 project records across 11 regions: South East (14), East of England (12), London (11), Wales (11), Scotland (6), North West (4), Yorkshire and the Humber (4), North East (3), South West (2), East Midlands (1), Northern Ireland (1). This is an evidence-led register, not a complete census of UK data centres.
- Where are new data centres planned?
- The largest proposed or approved projects with defined published capacity in the register are Devon Data Campus (Xlinks), near Great Torrington in South West (1,500 MW — published it load); Elsham Tech Park, former RAF Elsham Wolds in Yorkshire and the Humber (1,000 MW — published it load); Ebbsfleet AI Data Centre Campus, New Barn Road, Dartford (Clearstone) in South East (300 MW — published electrical demand); SDC M40 Campus, Wapseys Wood landfill, Gerrards Cross in South East (300 MW — published it load); Data centre campus, Hayes Bridge and Heathrow Interchange in London (250 MW — published electrical demand). Capacity types differ and are not summed or treated as equivalent demand.
- Which areas have the most data centres?
- South East has the most published project records in this register, with 14 each. Counts include projects at different stages, not just operational facilities.
Locations use coordinates recorded with published projects and the public sources linked in each profile; missing coordinates are not inferred. Research methodology.