VIRTUS LONDON1 data centre, Enfield

Enfield DC Service Company Limited

Enfield, LondonOperationalData centre4.3 MW (IT load) Verified — 2 sources on file

The VIRTUS LONDON1 data centre at Trade City, Crown Road, Enfield holds Environment Agency permit EPR/PP3225SX, issued on 13 September 2023 to Enfield DC Service Company Limited and recorded as effective on the public register. The permit relates to combustion plant on the site. No electrical capacity is stated on the register entry, so none is recorded.

Project detail

Operator / developer
Enfield DC Service Company Limited
Location
Enfield, London, United Kingdom
Status
Operational
AI relevance
Not stated
Announced
Not published
Target live date
Not published
Published capacity
  • 4.3 MW Published IT loadThe IT load the operator or planning documents state the facility will draw.
Floor area
Not published
Stated investment
Not published
Power
VIRTUS publishes 4.3 MW of IT load for LONDON1 in its 2025 specification sheet. An earlier VIRTUS sheet states 4.2 MW; the more recent operator document is used and the discrepancy is recorded here.
Grid connection
Not published
Cooling
Not published
Water
Not published
Planning authority
Not published
Planning reference
Not published
Planning decision
Not published
Decision date
Not published
Construction start
Not published
Expected completion
Not published
Operational since
Not published
Confidence
Medium confidence
Last verified
2026-08-18

Sources

Entry last updated 18/08/2026. Spotted something wrong? Tell us.