Back to the tracker

VIRTUS LONDON1 data centre, Enfield

Enfield DC Service Company Limited

Enfield, LondonOperational Verified

The VIRTUS LONDON1 data centre at Trade City, Crown Road, Enfield holds Environment Agency permit EPR/PP3225SX, issued on 13 September 2023 to Enfield DC Service Company Limited and covering combustion plant on the site. The permit states no electrical capacity; the 4.2 MW IT load recorded here comes from VIRTUS's current Enfield campus page (an older 2021 specification sheet gave 4.3 MW).

Reality Score

Not yet scored

This project has no published Reality Score yet. Projects in London with a higher score (Strong evidence or Likely):

Request a sample report on higher-scoring projects →

Key facts

Operator / developer
Enfield DC Service Company Limited
Location
Unit 3, Trade City, Crown Road, Enfield, Enfield, EN1 1TH, London, United Kingdom
Status
Operational
Facility type
Data centre
AI relevance
Not stated

Power & grid

Published capacity
  • 4.2 MW — Published IT loadThe IT load the operator or planning documents state the facility will draw.
Share of UK tracked capacity
0.1% of published it load
Power
VIRTUS states 4.2 MW of IT load for LONDON1 on its current Enfield campus page (checked 29 Sep 2026). An older VIRTUS specification sheet (2021) states 4.3 MW; the current operator page is used.

Planning

Benefits vs drawbacks

Benefits

  • Operator states it is powered by 100% renewable resources and designed to BREEAM GoodSource

Sources

Last verified

15 November 2026

Email me when this changes

Get an email when we update this project's published record.