Back to the tracker
VIRTUS LONDON1 data centre, Enfield
Enfield DC Service Company Limited
Enfield, LondonOperational Verified
The VIRTUS LONDON1 data centre at Trade City, Crown Road, Enfield holds Environment Agency permit EPR/PP3225SX, issued on 13 September 2023 to Enfield DC Service Company Limited and covering combustion plant on the site. The permit states no electrical capacity; the 4.3 MW IT load recorded here comes from the operator's published LONDON1 specification sheet.
Key facts
- Operator / developer
- Enfield DC Service Company Limited
- Location
- Unit 3, Trade City, Crown Road, Enfield, Enfield, EN1 1TH, London, United Kingdom
- Status
- Operational
- Facility type
- Data centre
- AI relevance
- Not stated
Power & grid
- Published capacity
- 4.2 MW — Published IT loadThe IT load the operator or planning documents state the facility will draw.
- Share of UK tracked capacity
- 0.1% of published it load
- Power
- VIRTUS states 4.2 MW of IT load for LONDON1 on its current Enfield campus page (checked 29 Sep 2026). An older VIRTUS specification sheet (2021) states 4.3 MW; the current operator page is used.
Planning
- Council
- London Borough of Enfield
Benefits vs drawbacks
Benefits
- Operator states it is powered by 100% renewable resources and designed to BREEAM GoodSource
Sources
- Public register entry EPR/PP3225SX - Enfield DC Service Company Limited, VIRTUS LONDON1 data centre, Crown Road, Enfield
Primary record · Environment Agency · 2023-09-13 · accessed 2026-08-12
- LONDON1 Enfield Data Centre Campus
Secondary source · VIRTUS Data Centres
- VIRTUS LONDON1 specification sheet (2021)
Secondary source · VIRTUS Data Centres
Last verified
27 September 2026
Entering the UK data-centre market?
Our 3-week Market Entry Sprint shows which projects to chase, who buys the packages, and what to do in the next 90 days. Built on the same sourced data as this tracker.