Nscale Loughton sovereign AI data centre

Nscale

Loughton, East of EnglandApproved

Nscale's Loughton, Essex site was named in the government's 2025 AI strategy as the UK's largest sovereign AI supercomputer and was due to open in 2027. Planning permission is in place, but the Guardian reported on 24 September 2026 that UK Power Networks had told Nscale it cannot supply the requested 90MW until the early-to-mid 2030s. In October 2026 Microsoft, the anchor tenant, ended its agreement for the site; Microsoft said the decision relates to this single site. Nscale says it remains committed to Loughton and is looking at alternative power sources.

Loughton data centre at a glance

Location
A former scaffolding yard in Loughton, Essex, in the Epping Forest District Council area. Nscale is the developer and operator.
Planning
Approved. Outline planning permission was granted in 2024 and a revised scheme was approved in mid-2026.Capacity
Grid power
Nscale requested up to 90 MW from UK Power Networks. The Guardian reported on 24 September 2026 that UK Power Networks cannot supply that power until the early-to-mid 2030s; UK Power Networks has not confirmed this.The Guardian (via inkl)
Timeline
Named in the government's 2025 AI strategy, the site was originally due to open in 2027. In October 2026 Microsoft, the anchor tenant, ended its agreement for this site. Nscale says it remains committed to Loughton and is looking at alternative power sources.Reuters (secondary)

Summary checked against this record on 7 November 2026. If anything differs, the detailed record and sources below take precedence. See the UK data centre map.

Reality Score

25SpeculativeStatus: Approved
How we score
Planning18/25
Grid connection0/25
Land and funding0/20
Delivery team0/15
Momentum7/15

A Reality Score assesses the public evidence behind a project. It is not its construction status, a probability of being built or a guarantee of procurement.

Public evidence for this project is limited so far. Projects in the UK with a higher score (Strong evidence or Likely):

Request a sample report on higher-scoring projects →

Key facts

Operator / developer
Nscale
Location
Loughton (former scaffolding yard), Loughton, East of England, United Kingdom
Status
Approved
Facility type
Data centre
AI relevance
High — AI/compute led

Power & grid

Network operator
UK Power Networks
Grid position
Reported: power not available until early-to-mid 2030s
Grid connection
Up to 90MW requested from UK Power Networks
Power
Nscale has requested up to 90MW. UK Power Networks has reportedly said sufficient power cannot be supplied until the early-to-mid 2030s (Guardian, 24 Sep 2026; not confirmed by UKPN).
On-site generation
Nscale is exploring on-site generation, including gas fuel cells, as an interim measure (Guardian).

Planning

Planning route
Local planning (TCPA)
Planning decision
Permission granted (outline 2024; revised scheme approved mid-2026)

Benefits vs drawbacks

Benefits

  • Named by the government as the UK's largest sovereign AI supercomputer siteSource
  • Planning permission granted, with government backingSource

Drawbacks

  • Grid power reportedly not available until the early-to-mid 2030s, against a 2027 launch targetSource
  • Possible interim on-site gas generationSource
  • Local objections including from Loughton Town Council over grid strain and energy demandSource

Timeline

  1. Guardian reports UK Power Networks cannot supply the requested 90MW until the early-to-mid 2030s; 2027 launch expected to slip.

    Source
  2. Microsoft ends its agreement to anchor the Loughton site after grid power slipped into the 2030s. Nscale says it is still committed and is looking at alternative power sources.