GreenScale Derry Campus (formerly Atlantic Hub), Foyle Port

GreenScale

Derry, Northern IrelandApproved Verified

Reserved matters approval (LA11/2023/1729/RM) granted by Derry City and Strabane District Council on 9 October 2024 for one IT service and data centre building with substation compounds, generators, switchgear and transformers on land east and west of Maydown Road, Derry. The statutory planning register states no capacity. The operator, GreenScale, states that the campus has secured grid connections totalling 100 MW, which is recorded here as grid-connection capacity rather than IT load.

Key facts

Operator / developer
GreenScale
Location
Lands east and west of Maydown Road, approximately 150 metres north and north-west of No. 23 Maydown Road, Derry, Derry, BT47 6UJ, Northern Ireland, United Kingdom
Status
Approved
Facility type
Data centre
AI relevance
Not stated

Power & grid

Published capacity
  • 100 MW — Published grid-connection capacityThe connection capacity secured or applied for, which is not the same as demand.
Share of UK tracked capacity
100% of published grid-connection capacity
Grid position
100MW grid connection secured (operator); 300MW+ described as feasible
Power
Operator states the Derry/Londonderry campus has secured grid connections delivering a total capacity of 100 MW. Recorded as grid connection capacity, not IT load.
On-site generation
Operator states behind-the-meter power and private-wire connections to nearby renewable generation are available (1.8GW of renewables operating nearby).
PUE target
1.2

Planning

Planning route
Local planning (TCPA)
Planning reference
LA11/2023/1729/RM
Planning decision
Granted (reserved matters)
Decision date
9 October 2024
Land area
11.9 ha

Benefits vs drawbacks

Benefits

  • 100MW grid connection already secured, per the operatorSource
  • Private-wire access to nearby renewable generation; target annual PUE of 1.2Source
  • Industrial-zoned port land with transatlantic fibre (EXA North)Source

Drawbacks

  • No jobs, water or backup generation figures publishedSource
  • Ready for service not until 2028, per the operatorSource
  • Campaigners estimate the four planned buildings at about 100MW each, and raise water concerns for the River Faughan and River FoyleSource

Timeline

  1. Derry City and Strabane District Council granted reserved matters (LA11/2023/1729/RM) on 9 October 2024 to Atlantic Hub Property Limited.

    Source

Reality Score

85Building
How we score
Planning25/25
Grid connection25/25
Land and funding20/20
Delivery team15/15
Momentum0/15

Sources

Last verified

27 September 2026

Entering the UK data-centre market?

Our 3-week Market Entry Sprint shows which projects to chase, who buys the packages, and what to do in the next 90 days. Built on the same sourced data as this tracker.

Email me when this changes

Get an email when we update this project's published record.