GreenScale Derry Campus (formerly Atlantic Hub), Foyle Port

GreenScale

Derry, Northern IrelandApproved Verified

Reserved matters approval (LA11/2023/1729/RM) granted by Derry City and Strabane District Council on 9 October 2024 for one IT service and data centre building with substation compounds, generators, switchgear and transformers on land east and west of Maydown Road, Derry. The statutory planning register states no capacity. The operator, GreenScale, states that the campus has secured grid connections totalling 100 MW, which is recorded here as grid-connection capacity rather than IT load.

Derry data centre at a glance

Location
Land east and west of Maydown Road, Derry (BT47 6UJ), in the Derry City and Strabane District Council area. GreenScale markets it as its Derry/Londonderry campus; it was formerly Atlantic Hub.GreenScale
What is approved
One IT service and data centre building, with substation compounds, generators, switchgear and transformers.
Planning
Approved. Derry City and Strabane District Council granted reserved matters approval LA11/2023/1729/RM on 9 October 2024.DAERA (NI Department of Agriculture, Environment and Rural Affairs)
Grid power
GreenScale states the campus has secured grid connections totalling 100 MW, and 300 MW or more has been described as feasible. The 100 MW is grid-connection capacity, not IT load; the planning register states no capacity.GreenScale
Timeline
No construction start or opening date is recorded.

Summary checked against this record on 7 November 2026. If anything differs, the detailed record and sources below take precedence. See the UK data centre map.

Reality Score

85Strong evidenceStatus: Approved
How we score
Planning25/25
Grid connection25/25
Land and funding20/20
Delivery team15/15
Momentum0/15

A Reality Score assesses the public evidence behind a project. It is not its construction status, a probability of being built or a guarantee of procurement.

Strong public evidence across the scored factors. Check the status and any named contractor before assuming packages are being let.

Supplying this project? Pro tells you every Monday when it moves →

Key facts

Operator / developer
GreenScale
Location
Lands east and west of Maydown Road, approximately 150 metres north and north-west of No. 23 Maydown Road, Derry, Derry, BT47 6UJ, Northern Ireland, United Kingdom
Status
Approved
Facility type
Data centre
AI relevance
Not stated

Power & grid

Published capacity
  • 100 MW — Published grid-connection capacityThe connection capacity secured or applied for, which is not the same as demand.
Share of UK tracked capacity
23% of published grid-connection capacity
Grid position
100MW grid connection secured (operator); 300MW+ described as feasible
Power
Operator states the Derry/Londonderry campus has secured grid connections delivering a total capacity of 100 MW. Recorded as grid connection capacity, not IT load.
On-site generation
Operator states behind-the-meter power and private-wire connections to nearby renewable generation are available (1.8GW of renewables operating nearby).
PUE target
1.2

Planning

Planning route
Local planning (TCPA)
Planning reference
LA11/2023/1729/RM
Planning decision
Granted (reserved matters)
Decision date
9 October 2024
Land area
11.9 ha

Benefits vs drawbacks

Benefits

  • 100MW grid connection already secured, per the operatorSource
  • Private-wire access to nearby renewable generation; target annual PUE of 1.2Source
  • Industrial-zoned port land with transatlantic fibre (EXA North)Source

Drawbacks

  • No jobs, water or backup generation figures publishedSource
  • Ready for service not until 2028, per the operatorSource
  • Campaigners estimate the four planned buildings at about 100MW each, and raise water concerns for the River Faughan and River FoyleSource

Timeline

  1. Derry City and Strabane District Council granted reserved matters (LA11/2023/1729/RM) on 9 October 2024 to Atlantic Hub Property Limited.