Cobalt Data Centre Campus (Stellium)
Stellium Datacenters
Wallsend, North EastOperational Verified
Plant replacement application recorded on a third-party aggregator.
Key facts
- Operator / developer
- Stellium Datacenters
- Location
- Wallsend, North East, United Kingdom
- Status
- Operational
- Facility type
- Data centre
- AI relevance
- Not stated
Power & grid
- Published capacity
- 80 MW — Reported capacity, definition not publishedA megawatt figure was reported but the source does not define what it measures, so it is excluded from every total.
- Grid position
- Dual 40 MVA feeds from the 275kV transmission network (operator FAQ)
- Power
- Stellium states "80 MWs (designed to scale to 180 MWs) of REGO certified renewable power available" for the campus, without saying whether that is IT load, site power or grid connection, so the figure is shown but excluded from every total. The same operator FAQ states Stellium 1 is allocated 15 MW of that capacity, that halls are "3MW IT data halls", and that dual 40 MVA feeds run from the 275 kV transmission network to Data Centre 1 Sector 1. A third-party directory (Colo-X) instead describes a 32 MW campus of three 8 MW buildings, also undefined. The conflict is unresolved and no figure is treated as an IT load.
- Backup fuel
- Mixed
- On-site generation
- FG Wilson 1,500kVA diesel generators (N+1) run on HVO per the operator, with fuel for 48 hours at full load; 2.3 MWh battery and solar PV (about 380,000 kWh a year).
- PUE target
- 1.24
Planning
- Council
- North Tyneside Council
- Planning route
- Local planning (TCPA)
- Planning reference
- 24/01678/FULM
- Planning decision
- Application Permitted
- Decision date
- 8 May 2025
Benefits vs drawbacks
Benefits
Drawbacks
- Diesel generator fleet (HVO-fuelled per operator) with 48 hours of on-site fuelSource
Timeline
North Tyneside Council permitted the application (24/01678/FULM).
Source
Sources
- Planning application 24/01678/FULM — removal of existing cooling plant and diesel generators and installation of 15 modular plant units, Hall 1 Data Centre 1, 9 Cobalt Park Way
Primary record · North Tyneside Council · 2025-05-08
- Stellium Datacenters campus specification and FAQs
Secondary source · Stellium Datacenters
Last verified
19 August 2026