South Mimms, South EastApprovedData centreCapacity not published Verified — 1 source on file

Outline permission only. The council cites 87,000 sq m of floorspace; no IT-load or grid-connection figure has been verified. The developer states the site was sold to Equinix in October 2025, which has not been verified from a regulatory filing.

Project detail

Operator / developer
DC01UK
Location
South Mimms, South East, United Kingdom
Status
Approved
AI relevance
Not stated
Announced
Not published
Target live date
Not published
Published capacity
Not published. No capacity figure means none has been published — it does not mean zero.
Floor area
Not published
Stated investment
Not published
Power
No IT load or electrical demand figure has been published. The developer states a power reservation of 400 MVA from the transmission network via the Elstree (Letchmore Heath) substation, with connection expected in 2029. MVA measures apparent power and is not directly equivalent to MW, so no capacity figure is recorded here.
Grid connection
Not published
Cooling
Not published
Water
Not published
Planning authority
Hertsmere Borough Council
Planning reference
Not published
Planning decision
Outline planning permission granted by planning committee
Decision date
2025-01-23
Construction start
Not published
Expected completion
Not published
Operational since
Not published
Confidence
Medium confidence
Last verified
2026-08-18

Sources

Entry last updated 18/08/2026. Spotted something wrong? Tell us.

South East in context

See every tracked project in South East, the capacity that has been disclosed there and how it connects to wider UK demand.