Back to the tracker

Longmarsh Green Energy data centre campus, Tilney St Lawrence and Fincham, West Norfolk

Tilney St Lawrence, East of EnglandProposed

Proposed 1GW data centre campus with up to 1.3GW of solar and battery storage across two West Norfolk sites, north-east of Tilney St Lawrence and near Fincham and Barton Bendish. EPL Norfolk puts the cost at more than £25bn. Public consultation runs from 15 October to 26 November 2026.

Reality Score

7Headline only
How we score
Planning0/25
Grid connection0/25
Land and funding0/20
Delivery team0/15
Momentum7/15

Key facts

Operator / developer
EPL Norfolk Limited
Location
Tilney St Lawrence, East of England, United Kingdom
Status
Proposed
Facility type
Data centre
AI relevance
Not stated
Stated investment
£25,000,000,000
Permanent jobs
500

Power & grid

Published capacity
  • 1,000 MW — Reported capacity, definition not publishedA megawatt figure was reported but the source does not define what it measures, so it is excluded from every total.
Grid connection
Developer expects a connection from 2031 at the existing Walpole transmission substation; no connection offer published.
On-site generation
Up to 1.3GW of solar and battery storage proposed alongside the campus.

Planning

Planning decision
Pre-application; public consultation 15 Oct to 26 Nov 2026

Timeline

  1. EPL Norfolk Limited unveils Longmarsh Green Energy (data centre and solar farm) and opens public consultation running to 26 Nov 2026.

    Source

Sources

Last verified

24 October 2026

Entering the UK data-centre market?

Our 3-week Market Entry Sprint shows which projects to chase, who buys the packages, and what to do in the next 90 days. Built on the same sourced data as this tracker.

Email me when this changes

Get an email when we update this project's published record.