Digital Realty Woking data centre
Digital Realty (UK) Limited
Digital Realty (UK) Limited operates a data centre at Kestrel Way on the Goldsworth Park Trading Estate in Woking under Environment Agency permit EPR/TP3530DV, issued on 27 February 2018. The permit decision document records 65 diesel-fuelled standby generators with an aggregated combustion capacity of 214 MW thermal. That is a heat input figure for backup plant and is not the site's IT load or grid connection, so no electrical capacity is recorded for this site.
Project detail
- Operator / developer
- Digital Realty (UK) Limited
- Location
- Woking, South East, United Kingdom
- Status
- Operational
- AI relevance
- Not stated
- Announced
- Not published
- Target live date
- Not published
- Published capacity
- Not published. No capacity figure means none has been published — it does not mean zero.
- Floor area
- Not published
- Stated investment
- Not published
- Power
- Environment Agency permit EPR/TP3530DV. The decision document states: "The combustion plant comprises 65 diesel fuelled standby generators... The aggregated total combustion capacity on site is 214MWth." This is thermal input for standby generation, not electrical demand.
- Grid connection
- Not published
- Cooling
- Not published
- Water
- Not published
- Planning authority
- Not published
- Planning reference
- Not published
- Planning decision
- Not published
- Decision date
- Not published
- Construction start
- Not published
- Expected completion
- Not published
- Operational since
- Not published
- Confidence
- Medium confidence
- Last verified
- 2026-08-12
Sources
- Environmental permit decision document EPR/TP3530DV - Digital Realty (UK) Limited, Kestrel Way, Woking
Primary record · Environment Agency · 2018-02-27 · accessed 2026-08-12
Entry last updated 12/08/2026. Spotted something wrong? Tell us.