DataVita DV4, Chapelhall
DataVita
A fourth DataVita data centre building proposed for the Chapelhall campus in North Lanarkshire, within the Lanarkshire AI Growth Zone, alongside the operating DV1 and the under-construction DV3. Planning permission in principle was submitted to North Lanarkshire Council in early September 2026, with a stated construction investment of £849.6 million over two years. The maximum building height was reduced from 30 to 26 metres following community consultation feedback.
Project detail
- Operator / developer
- DataVita
- Location
- Chapelhall, Scotland, United Kingdom
- Status
- Proposed
- AI relevance
- High — AI/compute led
- Announced
- 2026-09-02
- Target live date
- Not published
- Published capacity
- Not published. No capacity figure means none has been published — it does not mean zero.
- Floor area
- Not published
- Stated investment
- £849,600,000
- Power
- Not published
- Grid connection
- Not published
- Cooling
- Not published
- Water
- Not published
- Planning authority
- North Lanarkshire Council
- Planning reference
- Not published
- Planning decision
- Planning permission in principle sought; application submitted, decision pending
- Decision date
- Not published
- Construction start
- Not published
- Expected completion
- Not published
- Operational since
- Not published
- Confidence
- Medium confidence
- Last verified
- 2026-09-24
Key facts
Investment
£849.6 million of construction investment proposed over two years (Property Week)
Building height
Reduced from 30 metres to 26 metres following design changes made after community consultation
Campus context
Would sit alongside DV1 (operating since 2016) and DV3 (under construction) at the same Chapelhall campus
Sources
- DataVita submits plans for third data centre at Chapelhall
Secondary source · Scottish Construction Now · 7 September 2026
- DataVita submits plans for fourth Scottish data centre
Secondary source · Property Week · 7 September 2026
- DataVita submits plans for £849.6 million DV4 data centre in Scotland
Secondary source · Intelligent Data Centres · 2 September 2026
Entry last updated 24/09/2026. Spotted something wrong? Tell us.