DataVita DV4, Chapelhall

DataVita

Chapelhall, ScotlandPlanning submitted

A fourth DataVita data centre building proposed for the Chapelhall campus in North Lanarkshire, within the Lanarkshire AI Growth Zone, alongside the operating DV1 and the under-construction DV3. Planning permission in principle was submitted to North Lanarkshire Council in early September 2026, with a stated construction investment of £849.6 million over two years. The maximum building height was reduced from 30 to 26 metres following community consultation feedback.

Reality Score

35Speculative
How we score
Planning8/25
Grid connection0/25
Land and funding20/20
Delivery team0/15
Momentum7/15

Not buying yet. These projects in Scotland score Building or Likely:

Get the list of projects buying now →

Key facts

Operator / developer
DataVita
Location
Chapelhall, ML6 8HW, Scotland, United Kingdom
Status
Planning submitted
Facility type
Data centre
AI relevance
High — AI/compute led
Announced
2 September 2026
Stated investment
£849,600,000
Permanent jobs
120
Investment
£849.6 million of construction investment proposed over two years (Property Week)
Building height
Reduced from 30 metres to 26 metres following design changes made after community consultation
Campus context
Would sit alongside DV1 (operating since 2016) and DV3 (under construction) at the same Chapelhall campus

Power & grid

Heat reuse
Heat reuse built in from day one; talks under way with Monklands Replacement Hospital and the BioCity campus (Scottish Construction Now).
PUE target
1.25

Planning

Planning route
Scottish PPiP
Planning decision
Planning permission in principle sought; application submitted, decision pending

Benefits vs drawbacks

Benefits

  • 120 permanent skilled roles and 2,650 construction job-yearsSource
  • £75m Community Investment Fund over 15 yearsSource
  • Heat reuse planned from day one; closed-loop cooling targeting 0.05 litres of water per kWh or lessSource

Drawbacks

  • Planning permission in principle only; detailed consent still neededSource
  • No capacity (MW) or grid connection details publishedSource

£75m Community Investment Fund over 15 years; £30m+ business rates over 25 years; about 1,000m of new native hedgerow.

Timeline

  1. DataVita submitted a planning permission in principle application for DV4 (£849.6m).

    Source

Sources

Last verified

8 November 2026