Back to the tracker

Prosperity Parc, Holyhead (Anglesey)

Stena Line (via Anglesey Land Holdings)

Holyhead, WalesApproved

A data centre-led redevelopment of the former Anglesey Aluminium site at Holyhead, led by Stena Line through Anglesey Land Holdings. Outline planning permission was granted by the Isle of Anglesey County Council in September 2025. Named by government as one of two constituent sites (with Trawsfynydd, Gwynedd) of the North Wales AI Growth Zone announced in November 2025.

Reality Score

28Speculative
How we score
Planning18/25
Grid connection0/25
Land and funding10/20
Delivery team0/15
Momentum0/15

Key facts

Operator / developer
Stena Line (via Anglesey Land Holdings)
Location
Holyhead, Wales, United Kingdom
Status
Approved
Facility type
Data centre
AI relevance
High — AI/compute led
Announced
14 March 2025
Construction jobs
890
Permanent jobs
1,200
Site
217-220 acre brownfield former Anglesey Aluminium site, Holyhead
Proposed floorspace
2.5 million sq ft data centre plus 108,000 sq ft office and 54,000 sq ft R&D space, as stated by the applicant (Place North West)
Jobs
Around 1,200 operational jobs and 890 construction jobs claimed by the developer (Daily Post)
Investment
Described as a £1bn regeneration project by the developer; no data-centre capacity (MW) has been disclosed
Investment partner
As of the November 2025 AI Growth Zone announcement, no data-centre investment/operating partner had been secured (DatacenterDynamics)

Power & grid

Grid position
Uses the existing grid connection at the former Anglesey Aluminium site
On-site generation
Battery energy storage included in the low-carbon campus.

Planning

Planning route
Local planning (TCPA)
Planning reference
OP/2025/2
Planning decision
Outline planning permission granted
Decision date
11 September 2025
Green belt
No
Land area
89 ha

Benefits vs drawbacks

Benefits

  • Up to 1,200 jobs at peak operation and 890 during constructionSource
  • Reuses the 220-acre former Anglesey Aluminium site and its existing grid connectionSource
  • Projected £578m a year for the local economy at peakSource

Drawbacks

  • Outline only; a full application with detailed design is still to comeSource
  • Mixed campus: data centre MW not separated from industrial and office spaceSource

Timeline

  1. Isle of Anglesey County Council granted outline planning permission (OP/2025/2).

    Source

Sources

Last verified

12 October 2026

Email me when this changes