Back to the tracker

Spodegreen Data Centre, Little Bollington

Little Bollington, North WestProposed

Renewable energy firm Innova proposes a data centre campus on about 60ha (148 acres) of Tatton Estate farmland near Little Bollington, Cheshire, beside the M56. The plans include data halls, offices, a training facility, a district heat network and a solar farm. The site is in the green belt. The scheme is at public consultation only: no planning application has been made, and one is expected to go to Cheshire East Council in late 2026 or early 2027. No power capacity has been published, and no operator or tenant is named.

Key facts

Operator / developer
Innova
Location
Land south of Lymm Road (A56), north of the M56 and west of the A556, near Little Bollington (Tatton Estate), Little Bollington, North West, United Kingdom
Status
Proposed
Facility type
Data centre
AI relevance
Not stated

Power & grid

Grid position
Grid connection application status not published
Power
No MW, MVA or IT-load figure has been published. The developer says the campus would be grid connected, with on-site substations and backup generation.
On-site generation
A solar farm (west of Coe Lane) plus rooftop and car-park solar panels are proposed.
Cooling
Hybrid air and closed-loop water cooling, which the developer says would minimise water use.
Heat reuse
A district heat network and energy centre are proposed.

Planning

Planning route
Local planning (TCPA)
Green belt
Yes
Land area
60 ha

Benefits vs drawbacks

Benefits

  • About 350 jobs across construction and operation (developer estimate; split not published)Source
  • District heat network, on-site solar and apprenticeship and training funding proposedSource
  • Closed-loop cooling intended to minimise water useSource

Drawbacks

  • About 60ha of working farmland in the green beltSource
  • Residents object to the scale and location; one called it "a massive great industrial monster"Source
  • No power capacity, operator or grid connection details publishedSource

Developer proposes apprenticeship and training funding, a "Living Lab" teaching space and EV charging; it projects about £20m in additional business rates for Cheshire East (basis not published).

Timeline

  1. First public consultation drop-in held at High Legh Village Hall. Innova expects to apply to Cheshire East Council in late 2026 or early 2027.

    Source
  2. Residents raise concerns over the scale of the scheme and its green belt location, DCD reports.

    Source

Sources

Last verified

2 October 2026

Entering the UK data-centre market?

Our 3-week Market Entry Sprint shows which projects to chase, who buys the packages, and what to do in the next 90 days. Built on the same sourced data as this tracker.

Email me when this changes