Yondr London campus (former Uxbridge Road gas works and AkzoNobel paint factory), Slough
Yondr Group
Yondr Group's 100 MW London campus at 1 Petersfield Avenue, Slough, on the former Uxbridge Road gas works and disused AkzoNobel paint factory, beside the Grand Union Canal (Slough Arm). Building 1 (30 MW) went live in July 2024; Building 2 (30 MW) brought its first 10 MW online in April 2025; Building 3 (40 MW, approved July 2024, construction from February 2025) reached its first ready-for-service milestone in May 2026. Separate from Equinix's Wexham Road scheme on another part of the former AkzoNobel land. Yondr is owned by DigitalBridge.
Reality Score
Not yet scored
Not buying yet. These projects in South East score Building or Likely:
Get the list of projects buying now →Key facts
- Operator / developer
- Yondr Group
- Location
- 1 Petersfield Avenue, Slough, SL2 5EA, South East, United Kingdom
- Status
- Operational
- Facility type
- Data centre
- AI relevance
- Not stated
Power & grid
- Published capacity
- 100 MW — Published campus build-out capacityA whole-campus figure covering all phases. It is not current operational capacity.
- 100 MW — Reported capacity, definition not publishedA megawatt figure was reported but the source does not define what it measures, so it is excluded from every total.
- Share of UK tracked capacity
- 14.4% of published campus build-out capacity
- Power
- Three buildings: Building 1 30 MW (live July 2024), Building 2 30 MW (first 10 MW phase live April 2025), Building 3 40 MW (first ready-for-service milestone May 2026). About 100 MW total at build-out.
Planning
- Council
- Slough Borough Council
- Planning route
- Local planning (TCPA)
- Planning decision
- Building C (third building) granted by Slough Borough Council on 24 July 2024 (as reported by DCD / Slough Observer).
Benefits vs drawbacks
Benefits
- Brings a derelict paint factory site back into use; designed with Slough Borough Council and the Canal & River Trust to improve the canal sideSource
Timeline
Sources
- Yondr granted planning permission for third data center at Slough UK campus
Secondary source · DatacenterDynamics (secondary) · 2024-08
- Yondr breaks ground on third facility at 100MW London campus
Secondary source · DatacenterDynamics (secondary) · 2025-02-12
- Yondr opens new sustainable data centre in Slough campus
Secondary source · DataCentreNews UK (secondary) · 2025-04-17
- Yondr launches latest data center in Slough, UK
Secondary source · DatacenterDynamics (secondary) · 2026-05
Last verified
6 November 2026