NTT London 1 data centre, Yew Tree Avenue, Dagenham

NTT Global Data Centers

Dagenham, LondonOperational

NTT Global Data Centers' London 1 campus on the former Sanofi site at Yew Tree Avenue, Dagenham. The first building (London 1A) opened in January 2021 with 12,800 sqm of data centre space and 32 MW of IT load; NTT says the campus will reach 25,600 sqm and 64 MW when fully built out. A second building was reported under construction in late 2023.

Reality Score

Key facts

Operator / developer
NTT Global Data Centers
Location
Yew Tree Avenue, Dagenham, RM10 7FZ, London, United Kingdom
Status
Operational
Facility type
Data centre
AI relevance
Not stated
Floor area
12,800 m²

Power & grid

Published capacity
  • 32 MW — Published IT loadThe IT load the operator or planning documents state the facility will draw.
  • 64 MW — Published campus build-out capacityA whole-campus figure covering all phases. It is not current operational capacity.
Share of UK tracked capacity
0.7% of published it load
Power
NTT states 32 MW of critical IT load in the first building (64 MW once fully built out), two separate UPS systems (A and B feeds) with N+1 redundancy, and an on-site 80 MVA substation.

Planning

Planning route
Local planning (TCPA)
Land area
8 ha

Benefits vs drawbacks

Benefits

  • Reuses the former Sanofi pharmaceutical site in Dagenham (brownfield)Source

Timeline

  1. London 1A (first building) opens: 12,800 sqm, 32 MW IT load

    Source

Sources

Last verified

6 November 2026

Entering the UK data-centre market?

Our 3-week Market Entry Sprint shows which projects to chase, who buys the packages, and what to do in the next 90 days. Built on the same sourced data as this tracker.

Email me when this changes

Get an email when we update this project's published record.