Methodology and sources

How the UK AI Energy Index is compiled, classified, reviewed and corrected.

The UK AI Energy Index distinguishes between official figures, calculated figures, industry estimates, AI Energy Intelligence estimates and forecasts. Data-centre electricity consumption is not presented as AI-specific consumption unless reliable evidence supports that distinction.

Methodology version 1.0.

What each sub-index measures

AI Electricity Demand Index
Electricity consumed by UK data-centre and AI activity: annual consumption, share of national demand, AI-specific consumption where it can be isolated, quarterly and annual growth, published 2030 and 2035 forecasts, and estimated peak-power requirements.
Data Centre Growth Index
Physical infrastructure: operational facilities, facilities under construction, approved and proposed developments, new capacity in megawatts, regional concentration, hyperscale developments, and planning approvals and refusals.
Grid Pressure Index
Network capability: connection requests, average connection waiting time, projects delayed by insufficient capacity, available regional capacity, substation and transmission constraints, planned network investment, flexible connection agreements, and the risk of local congestion.

How data is classified

Every value carries one of the following classifications, shown next to the figure itself:

  • Official figure — published by the originating organisation and checked against the primary document.
  • Calculated from official figures — derived from official figures. The inputs, units, sources and formula are retained with the record, and the figure cannot be published without them.
  • Industry estimate — an estimate published by a third party, reproduced with its source.
  • AI Energy Intelligence estimate — our own estimate, with the method, assumptions and limitations stated.
  • Forecast — a projection of a future period, kept separate from observations.
  • Not disclosed — the figure exists but has not been made public.
  • Insufficient evidence — the available evidence does not support a defensible figure or rating.
  • Data not yet available — no figure has been entered yet. The cell stays empty rather than being filled, and zero is never used in its place.

Estimates and forecasts

Forecasts are never mixed into current observations. On the AI Electricity Demand Index they appear in a separate table, and charts plot only recorded readings for periods that have already occurred. No sub-index carries a headline score until enough sourced readings exist to support one; until then each reads “Baseline in development”.

Preventing duplicate developments

Each development is held once, as a unique record with its own project name, operator, location, status, capacity, planning authority and planning reference. The database enforces a single record per planning authority and reference, so a project reported by several outlets cannot be counted twice. Where a project appears under different names, the earlier record is amended rather than a second one created.

Regional definitions

Both the growth and grid-pressure sub-indices use the same nine regions. Slough and the Thames Valley is separated from the wider South East because of its concentration of existing capacity.

  • London
  • Slough and the Thames Valley
  • South East England
  • Midlands
  • North West England
  • North East and Yorkshire
  • Scotland
  • Wales
  • Northern Ireland

How grid-pressure ratings are assigned

A region receives one of five ratings: Low pressure, Moderate pressure, High pressure, Severe pressure, Insufficient evidence. A rating is only recorded when there is a written explanation and a stated evidence-confidence level. A rating of low, moderate, high or severe cannot be published unless at least two published evidence records are attached to the assessment; the database rejects the attempt and the region stays at “Insufficient evidence”. A rating is never assigned automatically from a single data point. Ratings reflect recorded evidence about connection demand, delays, constraints and planned investment — not opinion, and not the number of projects alone.

Review frequency and corrections

Every indicator carries its own update schedule and a “last reviewed” date, and the index as a whole is reviewed quarterly. Corrections supersede rather than erase: the previous record is retained and the change is logged. To request a correction, use our corrections policy or contact us with the indicator, the figure in question and the source you believe is correct.

Limitations of UK data

There is no single official register of UK data centres, their capacity or their electricity consumption. Operators are not required to disclose site-level load, planning records are held by individual authorities in inconsistent formats, and connection-queue data is published at network rather than facility level. AI-specific consumption is rarely separable from general compute. The index reflects those gaps openly instead of closing them with estimates.

Geographic definitions

Every figure records the geography it covers, because UK, Great Britain and single-nation statistics are not interchangeable. The available coverages are: United Kingdom, Great Britain, England, Scotland, Wales, Northern Ireland, UK region, Local authority, Individual facility, Other. Northern Ireland is assessed separately from Great Britain throughout the Grid Pressure Index.

Confidence ratings

Each figure and each regional assessment carries a confidence rating of High, Medium, Low, Not assessed. Confidence describes the strength of the underlying evidence, not the precision of the number.

Counting projects, campuses and capacity

One record represents one facility or development. Where several buildings share a campus, each building is recorded separately and the campus name links them, so campus capacity is never added to the individual building figures. Totals are reported by development status and are never combined: proposed developments are not added to operational facilities.

Capacity figures always state what they describe: IT load, Total facility load, Grid-connection capacity, Campus capacity, Capacity definition unclear, Not disclosed. IT load, total facility load and grid-connection capacity measure different things and are never treated as equivalent or summed together.

Forecasting rules

Forecasts are recorded against the year they describe, are labelled as forecasts wherever they appear, and are shown in their own table rather than alongside recorded consumption. A chart is only drawn when at least two genuine reporting periods have been entered and approved. We do not extrapolate a trend from a single observation.

Update process

  • Sources are checked monthly; the whole index is reviewed quarterly.
  • Every record stores the date it was last checked and the date it is next due.
  • A replacement value never overwrites history: the earlier reporting period is kept, the superseded figure is marked as such, and the change is logged with who made it, when, why and against which source.
  • Superseded sources are retained and marked superseded rather than deleted.

Source categories monitored

The index draws on publications from the organisations below. Listing an organisation does not imply a figure has been taken from it: a source only appears in the register once its document title, URL and publication date have been entered and verified.

  • Department for Energy Security and Net Zero
  • Department for Science, Innovation and Technology
  • National Energy System Operator
  • Ofgem
  • National Grid Electricity Transmission
  • UK Power Networks
  • National Grid Electricity Distribution
  • Scottish and Southern Electricity Networks
  • Electricity North West
  • Northern Powergrid
  • SP Energy Networks
  • SONI
  • NIE Networks
  • Utility Regulator Northern Ireland
  • Local-authority planning portals
  • Planning Data service
  • House of Commons Library

Change history

  • indicator — value

    The official DESNZ share for 2024 replaces an internal calculation whose reporting periods did not match.

    Previously: 1.9 per cent (internally calculated) · Now: Superseded by DESNZ 2024 official share of 1.8 per cent

    15 Aug 2026 · AI Energy Intelligence editorial

  • subindex — status_label

    Published the first evidence-based baseline for the AI Electricity Demand Index using the DESNZ Energy Trends June 2026 special feature article and its accompanying workbook.

    Previously: Baseline in development · Now: 2024 baseline

    15 Aug 2026 · AI Energy Intelligence editorial

  • indicator — value

    The NESO Clean Power 2030 modelling input is no longer presented as the principal baseline. It is retained as historical context with its original classification.

    Previously: 5 TWh per year (NESO modelling input) · Now: Superseded by DESNZ 2024 estimate of 4.5 TWh

    15 Aug 2026 · AI Energy Intelligence editorial

  • dc_project — record

    New record added following primary-source verification on the London Borough of Hillingdon planning register: application 38421/APP/2021/4045, status Approval, decided 26 April 2022.

    Previously: · Now: published

    12 Aug 2026 · Editorial team

  • dc_project — record

    New record added on the basis of Environment Agency permit EPR/PP3225SX, issued 13 September 2023 and recorded as effective on the public register.

    Previously: · Now: published

    12 Aug 2026 · Editorial team

  • dc_project — record

    New record added on the basis of Environment Agency permit EPR/TP3530DV and its decision document, issued 27 February 2018. The 214MWth figure is generator thermal input and is excluded from capacity reporting.

    Previously: · Now: published

    12 Aug 2026 · Editorial team

  • dc_project — record

    New record added on the basis of Environment Agency permit EPR/QP3533ED and its decision document for Carlton Park Data Centre 1 & 2, operated by Santander UK Plc.

    Previously: · Now: published

    12 Aug 2026 · Editorial team

  • dc_project — record

    New record added following primary-source verification on the London Borough of Hillingdon planning register: hybrid application 78343/APP/2025/719, status Approval, decided 29 October 2025.

    Previously: · Now: published

    12 Aug 2026 · Editorial team

  • dc_project — record

    New record added following primary-source verification on the Cardiff Council planning register: application 24/00624/FUL, permission granted, decision issued 15 April 2025.

    Previously: · Now: published

    12 Aug 2026 · Editorial team

  • dc_project — record

    New record added following primary-source verification on the Salford City Council planning register: application PA/2024/1810, approved with conditions, decision date 23 July 2025.

    Previously: · Now: published

    12 Aug 2026 · Editorial team

  • dc_project — status_publication

    Primary-source verification completed on the South Lanarkshire Council planning register. Recorded as proposed: P/25/0490 is an EIA screening opinion (EIA required, issued 25 June 2025), not a planning permission for the campus.

    Previously: draft · Now: published

    12 Aug 2026 · Editorial team

  • dc_project — status_publication

    Primary-source verification completed on the Northumberland County Council planning register: outline application 24/04112/OUTES permitted, decision issued 8 May 2025, for up to ten data centre buildings totalling 540,000 sqm GIA.

    Previously: draft · Now: published

    12 Aug 2026 · Editorial team

  • dc_project — status_publication

    Primary-source verification completed on the Northern Ireland Planning Portal: reserved matters application LA11/2023/1729/RM determined and granted on 9 October 2024. Application reference, decision, decision date, applicant and site address corrected against the statutory register.

    Previously: draft · Now: published

    12 Aug 2026 · Editorial team

  • dc_project — duplicate_reviewed

    Assessed as the same scheme as the Atlantic Hub record at Maydown Road, Derry. No separate planning application exists under the GreenScale name. Held unpublished to prevent double-counting.

    Previously: false · Now: true

    12 Aug 2026 · Editorial team

  • dc_project — record

    New project record added as a private draft; evidence insufficient for publication.

    Previously: · Now: Northtree conversion, Hemel Hempstead - approved (draft)

    12 Aug 2026 · Editorial team · Methodology v1.0

  • dc_project — record

    New project record added as a private draft; evidence insufficient for publication.

    Previously: · Now: Ratcliffe-on-Soar power station site - proposed (draft)

    12 Aug 2026 · Editorial team · Methodology v1.0

  • dc_project — record

    New project record added as a private draft; evidence insufficient for publication.

    Previously: · Now: Kao Data Kenwood Point, Stockport - approved (draft)

    12 Aug 2026 · Editorial team · Methodology v1.0

  • dc_project — record

    New project record added as a private draft; evidence insufficient for publication.

    Previously: · Now: Cobalt Data Centre Campus (Stellium) - approved (draft)

    12 Aug 2026 · Editorial team · Methodology v1.0

  • dc_project — record

    New project record added as a private draft; evidence insufficient for publication.

    Previously: · Now: Cambois data centre campus - proposed (draft)

    12 Aug 2026 · Editorial team · Methodology v1.0

  • dc_project — record

    New project record added as a private draft; evidence insufficient for publication.

    Previously: · Now: Skelton Grange, Leeds - proposed (draft)

    12 Aug 2026 · Editorial team · Methodology v1.0

  • dc_project — record

    New project record added as a private draft; evidence insufficient for publication.

    Previously: · Now: Deep Green Bradford, Listerhills Road - approved (draft)

    12 Aug 2026 · Editorial team · Methodology v1.0

  • dc_project — record

    New project record added as a private draft; evidence insufficient for publication.

    Previously: · Now: Teledata Wythenshawe - approved (draft)

    12 Aug 2026 · Editorial team · Methodology v1.0

  • dc_project — record

    New project record added as a private draft; evidence insufficient for publication.

    Previously: · Now: Next Generation Data Newport campus - operational (draft)

    12 Aug 2026 · Editorial team · Methodology v1.0

  • dc_project — record

    New project record added as a private draft; evidence insufficient for publication.

    Previously: · Now: Haspielaw Farm, Hamilton - proposed (draft)

    12 Aug 2026 · Editorial team · Methodology v1.0

  • dc_project — record

    New project record added as a private draft; evidence insufficient for publication.

    Previously: · Now: GreenScale, Foyle Port - proposed (draft)

    12 Aug 2026 · Editorial team · Methodology v1.0

  • dc_project — record

    New project record added as a private draft; evidence insufficient for publication.

    Previously: · Now: Atlantic Hub, Foyle Port - approved (draft)

    12 Aug 2026 · Editorial team · Methodology v1.0

  • dc_project — record

    New project record added as a private draft; evidence insufficient for publication.

    Previously: · Now: AtlasEdge Colombus Way, Salford - approved (draft)

    12 Aug 2026 · Editorial team · Methodology v1.0

  • dc_project — record

    New project record added and published; primary source from the planning or permitting authority verified.

    Previously: · Now: Digital Realty Crawley - operational (published)

    12 Aug 2026 · Editorial team · Methodology v1.0

  • dc_project — record

    New project record added and published; primary source from the planning or permitting authority verified.

    Previously: · Now: Global Switch London - operational (published)

    12 Aug 2026 · Editorial team · Methodology v1.0

  • dc_project — record

    New project record added and published; primary source from the planning or permitting authority verified.

    Previously: · Now: Equinix LD8 - operational (published)

    12 Aug 2026 · Editorial team · Methodology v1.0

  • dc_project — record

    New project record added and published; primary source from the planning or permitting authority verified.

    Previously: · Now: VIRTUS Stockley Park campus - operational (published)

    12 Aug 2026 · Editorial team · Methodology v1.0

  • dc_project — record

    New project record added and published; primary source from the planning or permitting authority verified.

    Previously: · Now: Manor Farm and land north of Wraysbury Reservoir - approved (published)

    12 Aug 2026 · Editorial team · Methodology v1.0

  • dc_project — record

    New project record added and published; primary source from the planning or permitting authority verified.

    Previously: · Now: DC01UK, South Mimms - approved (published)

    12 Aug 2026 · Editorial team · Methodology v1.0

  • dc_project — record

    New project record added and published; primary source from the planning or permitting authority verified.

    Previously: · Now: Vantage Bridgend campus (former Ford engine plant) - proposed (published)

    12 Aug 2026 · Editorial team · Methodology v1.0

  • dc_project — record

    New project record added and published; primary source from the planning or permitting authority verified.

    Previously: · Now: 1 Redheughs Avenue data centre, South Gyle - refused (published)

    12 Aug 2026 · Editorial team · Methodology v1.0

  • dc_project — record

    New project record added as a private draft; evidence insufficient for publication.

    Previously: · Now: Equinix Wexham Road (former AkzoNobel site) - approved (draft)

    12 Aug 2026 · Editorial team · Methodology v1.0

  • dc_project — record

    New project record added as a private draft; evidence insufficient for publication.

    Previously: · Now: Data Centre Campus, Ampthill Road, Bedford - proposed (draft)

    12 Aug 2026 · Editorial team · Methodology v1.0

  • dc_project — record

    New project record added as a private draft; evidence insufficient for publication.

    Previously: · Now: Kao Data Harlow, Plot F (KLON-07 and KLON-08) - proposed (draft)

    12 Aug 2026 · Editorial team · Methodology v1.0

  • dc_project — record

    New project record added as a private draft; evidence insufficient for publication.

    Previously: · Now: Premier Park data centre, Park Royal - approved (draft)

    12 Aug 2026 · Editorial team · Methodology v1.0

  • dc_project — record

    New project record added as a private draft; evidence insufficient for publication.

    Previously: · Now: Amazon Web Services, Plot 3 Maylands Avenue - proposed (draft)

    12 Aug 2026 · Editorial team · Methodology v1.0

  • datapoint — gb-colocation-data-centre-capacity.publication_date

    Phase 1 audit: the DSIT research and analysis page was published on 1 May 2025; 11 March 2025 is the date the underlying Parliamentary Question answer was first published. Both dates are now recorded.

    Previously: 2025-03-11 · Now: 2025-05-01

    12 Aug 2026 · AI Energy Intelligence editorial · Methodology 1.0

  • datapoint — Grid Pressure Index

    Phase 4 expansion from the NESO Grid Code Development Forum pack.

    Previously: No record · Now: Added total contracted connection demand in the GB queue: 125 GW (November 2025), recorded as an all-technology figure.

    12 Aug 2026 · AI Energy Intelligence editorial · Methodology 1.0

  • datapoint — Data Centre Growth Index

    Phase 3 expansion from the DSIT regional capacity table.

    Previously: No record · Now: Added colocation data-centre IT capacity for eleven Great Britain regions (autumn 2024), totalling 1.6 GW.

    12 Aug 2026 · AI Energy Intelligence editorial · Methodology 1.0

  • datapoint — Electricity Demand Index

    Phase 2 expansion from NESO primary documents opened and read in full.

    Previously: No record · Now: Added: GB data-centre demand 7.6 TWh (FES 2025); connected capacity 2.4 GW; GB total demand 263 TWh (2023); GB peak demand 58 GW (2023); GB total demand 287 TWh (2030 forecast); calculated data-centre share 1.9%; 2035 demand 30-41 TWh; 2050 demand 51-71 TWh plus the earlier 62 TWh figure.

    12 Aug 2026 · AI Energy Intelligence editorial · Methodology 1.0

  • indicator — ai-attributable-electricity-demand.caveats

    Phase 1 audit: data-gap note required by the methodology.

    Previously: No caveat recorded · Now: Recorded why this indicator remains "Insufficient evidence": no reviewed UK source separates AI workloads from wider data-centre consumption.

    12 Aug 2026 · AI Energy Intelligence editorial · Methodology 1.0

  • datapoint — uk-ai-capable-capacity-requirement-2030.value_text

    Phase 1 audit: the UK Compute Roadmap says "at least 6GW". The published wording was more precise than the source.

    Previously: 6 GW · Now: At least 6 GW

    12 Aug 2026 · AI Energy Intelligence editorial · Methodology 1.0

  • datapoint — gb-data-centre-electricity-consumption-2030.limitations

    Phase 1 audit: FES 2025 replaces the Clean Power 2030 demand trajectory. The historical forecast is retained.

    Previously: No limitation recorded · Now: Flagged as superseded for forecasting purposes by FES 2025 (30-41 TWh by 2035).

    12 Aug 2026 · AI Energy Intelligence editorial · Methodology 1.0

  • datapoint — gb-data-centre-electricity-consumption.limitations

    Phase 1 audit: a newer NESO estimate exists. The historical record is retained, not overwritten.

    Previously: No limitation recorded · Now: Flagged as superseded by NESO FES 2025 (7.6 TWh); retained as the published November 2024 position.

    12 Aug 2026 · AI Energy Intelligence editorial · Methodology 1.0

  • datapoint — value

    First evidence-based baseline entry, verified against the original source document and approved for publication.

    Previously: · Now: 22

    11 Aug 2026 · Editorial review

  • datapoint — value

    First evidence-based baseline entry, verified against the original source document and approved for publication.

    Previously: · Now: 6

    11 Aug 2026 · Editorial review

  • datapoint — value

    First evidence-based baseline entry, verified against the original source document and approved for publication.

    Previously: · Now: 1.6

    11 Aug 2026 · Editorial review

  • datapoint — value

    First evidence-based baseline entry, verified against the original source document and approved for publication.

    Previously: · Now: 5

    11 Aug 2026 · Editorial review

Submit a correction

If you believe a figure, rating or record here is wrong, tell us. Submissions enter an administrator review queue and never change published data automatically.

Submissions enter an administrator review queue. Published data is never changed automatically by a submission.

Source register

Sources used by the UK AI Energy Index
OrganisationPublication or datasetPublishedIndicators supportedTypeAccessedNotes
Bridgend County Borough CouncilOfficers' Report, application P/25/247/HYB, former Ford Engine Plant, Bridgendofficial12 Aug 2026Hybrid application; committee decision not confirmed in the document reviewed.
Department for Science, Innovation and Technology (DSIT)UK Compute RoadmapUK AI-capable data-centre capacity requirement (2030 forecast)official11 Aug 2026Published July 2025 (exact day of publication not stated on the page, so no publication date has been recorded). Evidence located in the AI Growth Zones section: "We forecast that the UK will need at least 6GW of AI-capable data centre capacity by 2030 - a threefold increase on the data centre capacity that is available in the UK today." The document does not define whether "AI-capable capacity" refers to IT load, facility load or grid-connection capacity.
Environment AgencyEnvironmental permit decision document EPR/QP3533ED - Carlton Park Data Centre 1 & 2, Santander UK Plc, NarboroughData Centre Growth Index - project registerofficial12 Aug 2026EA decision document: "We have decided to grant the permit for Carlton Park Data Centre 1 & 2 operated by Santander UK Plc." Permit covers standby diesel/DRUPS backup generation only, not IT load.
Scottish Government, Planning and Environmental Appeals DivisionCase PPA-230-2794, 1 Redheughs Avenue, Edinburghofficial12 Aug 2026Appeal following refusal by City of Edinburgh Council.
National Energy System Operator (NESO)Options for optimising GB Data Centres (NIA2_NESO098)Grid pressure — qualitative context onlyofficial11 Aug 2026Innovation project page. Identifies grid connection availability and power cost among the drivers of data-centre siting and recommends a single consolidated annual view of the GB data-centre estate. Qualitative only: the page publishes no regional constraint figures, so it cannot on its own support a regional grid pressure rating.
Department for Energy Security and Net Zero (DESNZ)Energy Trends, June 2026 - special feature article: Data centre electricity consumption in Great Britain, 2020 to 202430 Jun 2026Great Britain data-centre electricity consumption 2020-2024; data-centre share of grid electricity consumption; regional and local-authority breakdownsofficial15 Aug 2026Accompanying official workbook: Data_centre_electricity_consumption_in_Great_Britain__2020_to_2024.xlsx (https://assets.publishing.service.gov.uk/media/6a3e9f32eaee00074150f678/Data_centre_electricity_consumption_in_Great_Britain__2020_to_2024.xlsx). Worksheets used: Table_1 (consumption, GWh), Table_2 (consumption, TWh, including the percentage change 2020 to 2024), Table_3 (data-centre share of electricity consumed from the grid). The figures are DESNZ statistical estimates of electricity consumed from the public grid by data centres; they are not directly metered totals and are not separated by workload type.
Ministry of Housing, Communities and Local GovernmentData Centre Campus, Ampthill Road, Bedford in Central Bedfordshire: Section 35 Direction, Planning Act 200815 Jun 2026official12 Aug 2026Direction only; no substantive planning decision.
Ministry of Housing, Communities and Local GovernmentRecovered appeal decision: Manor Farm and land north of Wraysbury Reservoir, Poyle Road, Slough (APP/J0350/W/25/3366043)10 Jun 2026official12 Aug 2026Secretary of State allowed the appeal subject to conditions.
Harworth Group plcHarworth and Microsoft receive resolution to grant planning consent for hyperscale data centre at Skelton Grange, Leeds27 Apr 2026operator12 Aug 2026A resolution to grant is not an issued decision notice.
Rushcliffe Borough CouncilRatcliffe on Soar Power Station Local Development Order - Proposed Revisions, Cabinet report14 Apr 2026official12 Aug 2026Order revision only; no specific data-centre scheme, operator or capacity.
Old Oak and Park Royal Development CorporationPlanning Committee report, Unit F, 6 Premier Park Road, London NW10 7NZ (25/0196/FUMOPDC)26 Feb 2026official12 Aug 2026Decision date conflicts with a third-party record; not used for publication pending the decision notice.
National Energy System Operator (NESO)Grid Code Development Forum, 5 November 2025 - Large Demand Technical Requirements5 Nov 2025GB data-centre demand and connected capacity; FES 2025 pathway demand for 2035 and 2050; contracted connection demand in the queueoperator12 Aug 2026NESO industry forum pack. Slide 10 states current GB data-centre demand, connected capacity and pathway figures, citing FES 2025 and Energy Networks Association connections data.
London Borough of HillingdonPlanning application 78343/APP/2025/719 - Hybrid four-phase data centre campus, Hayes Bridge Retail Park and Heathrow Interchange, Uxbridge Road, Hayes29 Oct 2025Data Centre Growth Index - project registerofficial12 Aug 2026Statutory register: Status "Approval", Decided 29-10-25. Hybrid application: Phase 1 full, Phases 2-4 outline. No capacity stated.
Department for Energy Security and Net Zero (DESNZ) / Europe EconomicsImpact of growth of data centres on energy consumption14 Aug 2025Context and methodology only — supports no national totalofficial11 Aug 2026Reviewed and found to contain no UK data-centre electricity consumption or capacity total. The study compares digital service delivery with physical alternatives across individual use cases (video streaming, eBooks, AI translation, and ten further cases in the follow-up study). Registered for methodological context only; no index value is derived from it.
Salford City CouncilPlanning application PA/2024/1810 - Data centre and ancillary office, former White's Reclamation Site, Liverpool Road, Eccles23 Jul 2025Data Centre Growth Index - project registerofficial12 Aug 2026Statutory register: Status "Decision Made", Decision "Approve with Conditions", Decision date 23/07/2025. Planning Panel, committee 06/02/2025. Applicant listed as "c/o agent".
National Energy System Operator (NESO)Future Energy Scenarios 2025: Pathways to Net Zero1 Jul 2025GB data-centre electricity demand; 2035 and 2050 pathway demandofficial12 Aug 2026FES 2025 rebuilt the data-centre demand model using DNO and TO connection information. Pathway figures are scenarios, not predictions.
South Lanarkshire CouncilPlanning application P/25/0490 - EIA screening opinion request, proposed data centre campus, Haspielaw Farm, Hamilton25 Jun 2025Data Centre Growth Index - project registerofficial12 Aug 2026Statutory register: Screening Opinion request. Status Decided. Decision "Screening opinion - EIA required", issued 25 Jun 2025. Not a planning permission.
Environment AgencyRH10 9BD, Digital Realty (UK) Limited: environmental permit issued9 Jun 2025regulator12 Aug 2026Standby generation permit for the Crawley campus.
Northumberland County CouncilPlanning application 24/04112/OUTES - Outline application for up to ten data centre buildings, former power station site, Cambois8 May 2025Data Centre Growth Index - project registerofficial12 Aug 2026Statutory register: Status Permitted, Decision "Application Permitted", Decision Issued 08 May 2025, committee decision 04 Mar 2025. Applicant Renaissance Land Limited.
Cardiff CouncilPlanning application 24/00624/FUL - Energy park and data centre, Land at Rover Way, Splott, Cardiff15 Apr 2025Data Centre Growth Index - project registerofficial12 Aug 2026Statutory register: Status Decided, Decision "Permission Granted", Decision Issued Date 15 Apr 2025. Committee resolution 17 Oct 2024 subject to S106; permission subsequently issued.
Department for Science, Innovation and Technology (DSIT)Estimate of Data Centre Capacity: Great Britain 202411 Mar 2025GB colocation data-centre capacity (maximum rated IT load)official11 Aug 2026Restates the answer to Parliamentary Question HL5239, answered 11 March 2025. Evidence located in the body table "IT power (MW)" by ITL1 region, with a stated total of 1.6 gigawatts. Capacity is defined as the maximum rated IT load of colocation data centres and excludes enterprise data centres. Figures are modelled estimates informed by industry engagement and are rounded.
Hertsmere Borough CouncilData centre in Hertsmere given outline permission by planning committee23 Jan 2025official12 Aug 2026Planning authority's own record of the committee decision.
National Energy System Operator (NESO)Clean Power 2030 — Annex 1: Electricity demand and supply analysis5 Nov 2024GB data-centre electricity consumption (baseline and 2030 projection)official11 Aug 2026Evidence located on page 4, section 2.1.3 "Basis for our analysis": "Growth in data centres (from 5 TWh today) is based on registers of planning and grid connection applications to 22 TWh in 2030." Figures are modelling inputs to the Clean Power 2030 pathway, not measured statistics, and cover all data centres rather than AI workloads specifically.
Derry City and Strabane District Council (Northern Ireland Planning Portal)Planning application LA11/2023/1729/RM - Erection of one IT service and data centre buildings, Maydown Road, Derry9 Oct 2024Data Centre Growth Index - project registerofficial12 Aug 2026Statutory planning register entry. Status: Determined. Decision: Granted. Applicant: Atlantic Hub Property Limted (as spelled on the register).
Environment AgencyDecision document EPR/DP3906BE/A001 (Equinix LD8, Slough)16 Oct 2023regulator12 Aug 2026Permit covers 64 MWth generator thermal input, not IT load.
Environment AgencyPublic register entry EPR/PP3225SX - Enfield DC Service Company Limited, VIRTUS LONDON1 data centre, Crown Road, Enfield13 Sept 2023Data Centre Growth Index - project registerofficial12 Aug 2026EA public register: permit EPR/PP3225SX, holder Enfield DC Service Company Limited, issued 13/09/2023, status Effective. No capacity value on the register entry.
London Borough of HillingdonPlanning application 38421/APP/2021/4045 - Data centre campus, Land at Tudor Works, Beaconsfield Road, Hayes26 Apr 2022Data Centre Growth Index - project registerofficial12 Aug 2026Statutory register: Status "Approval", Decided 26-04-22. Agent Savills. No capacity or floorspace stated on the register entry.
Environment AgencyDecision document EPR/AP3903PD/A001 (VIRTUS Stockley Park)16 Nov 2021regulator12 Aug 2026Permit granted for London 5 and 6; refused in part for London 7 and 8.
Environment AgencyE14 9YY, Global Switch Limited: environmental permit issued28 Jun 2019regulator12 Aug 2026Permit covering the East India Dock Road site.
Environment AgencyEnvironmental permit decision document EPR/TP3530DV - Digital Realty (UK) Limited, Kestrel Way, Woking27 Feb 2018Data Centre Growth Index - project registerofficial12 Aug 2026EA decision document: 65 diesel standby generators, "aggregated total combustion capacity on site is 214MWth". This is generator thermal input, NOT IT load, facility load or grid connection capacity.