Executive summary

What this report covers

The UK's data-centre sector is undergoing rapid, historically unprecedented expansion driven by demand for AI compute. This report examines electricity demand, grid capacity and infrastructure implications entering 2027 and through to 2035 — from DSIT's first official consumption estimates and Ofgem's connection-queue reform to AI Growth Zones, water and carbon pressures, and three demand scenarios to 2035.

Key findings

Headline conclusions

  • GB data-centre electricity demand reached 4.5 TWh in 2024 — about 2% of the 249.2 TWh consumed from the GB grid — according to DSIT's first official estimates (June 2026).
  • UK data-centre electricity demand grew 41% between 2020 and 2024, with London and the South East — particularly Slough — accounting for 77% of consumption (DSIT, June 2026).
  • The grid-connection queue grew from 41 GW to 125 GW in under a year, with data centres accounting for at least 80 GW of applications — making connection the principal constraint on development (Ofgem, 2026).
  • NESO's Clean Power 2030 central projection puts annual data-centre electricity demand at 22 TWh by 2030 (NESO, November 2024).
  • Multiple authoritative forecasts project data-centre demand rising four- to fivefold by 2030, though ranges vary significantly and AI-specific consumption cannot currently be isolated with precision.
  • Environmental pressures — water, carbon, land — are growing but remain poorly measured in a UK-specific context, particularly for AI workloads.
Who should read this

Intended audience

  • UK policymakers, regulators and DESNZ / Ofgem / DSIT analysts
  • Data centre operators, hyperscalers and grid planners
  • Institutional investors and infrastructure funds
  • Energy suppliers, generators and network operators
  • Journalists and researchers covering AI and UK energy
Table of contents

Inside the 18-page report

  1. 011. Executive summary — key figures, conclusions and priorities
  2. 022. UK AI energy position entering 2027
  3. 033. UK data-centre electricity demand
  4. 044. Data-centre development pipeline
  5. 055. Regional development outlook
  6. 066. Can the electricity grid support AI growth?
  7. 077. Energy supply required for AI
  8. 088. Water, carbon and environmental pressure
  9. 099. Economic and community implications
  10. 1010. Three demand scenarios to 2035
  11. 1111. UK AI Energy Index dashboard
  12. 1212. Priorities for 2027
  13. 1313. Outlook to 2030 and 2035
  14. 1414. Methodology, sources and references
Accuracy

Publisher, corrections and disclaimer

Publisher: AI Energy Intelligence UK

Status: Published.

Figures described as forecasts, scenarios or estimates are modelled, not measured. Spotted something wrong? Submit a correction.

Preview

Sample pages

Frequently asked questions

Is the report free to download?+

Yes — the full UK AI Energy Outlook 2027 is free. We ask for an email so we can send you future updates and related research.

Where do the figures come from?+

Official government statistics (DSIT, DESNZ), regulatory publications (Ofgem, NESO), operator announcements and peer-reviewed research. Every figure is labelled as official statistics, company announcement, industry estimate, academic estimate or forecast scenario.

How often is it updated?+

Annually — the next planned edition is the UK AI Energy Outlook 2028 in August 2027.

Download the full report

Enter your email to get the full PDF plus the weekly UK AI energy briefing.